Moved without losing refrigerant

AC removal & refitting in Al Mustaqbal

In Al Mustaqbal, south of Jeddah, homeowners request AC removal and refitting when moving between modern villas or redesigning spaces. Alrabih's team pumps the refrigerant to the outdoor unit, safely transports both across the wide street, then installs new copper and tests performance.

  • Refrigerant saved
  • Fresh copper
  • Holes sealed

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When you need removal and refitting

  1. 1

    Moving to a new home

    You want to take your units to the new home without losing the refrigerant charge or arriving with a unit that no longer cools properly. The right removal keeps the charge locked in the outdoor unit until refitting.

  2. 2

    Renovation or repainting

    Contractors need a clear wall for painting or plastering. We remove the indoor unit after saving the refrigerant, and once the renovation is done, we refit and close old holes that would otherwise spoil the fresh wall finish.

  3. 3

    Repositioning a unit in the same building

    The current position may no longer suit new furniture, or the old wall core is in the wrong place. We move it to the better spot and plan the new copper and drain route before drilling anything.

Who it's for

  • Renovating your flat and need walls cleared

    We remove indoor units after pump-down, seal old holes, then refit once finishing work is complete so your units are never handled by the renovation crew.

    Ask on WhatsApp
  • Relocating your business to new premises

    We survey both premises, pump down, remove the units from the current site, then refit them at the new location with copper runs and drain lines suited to the new building layout.

    Ask on WhatsApp

What the service covers

  • Pump-down into outdoor unit
  • Remove both units cap pipes
  • Seal old wall holes
  • Mueller copper insulated on site
  • Vacuum test and start-up
Request a quote

How we work

How we work

  1. 1

    Survey both sites

    We visit the removal site and the new location to plan the copper route, drain line and run length, and tell you if new copper or extra materials are needed.

  2. 2

    Pump down and remove

    We run the unit in pump-down mode until all refrigerant moves into the outdoor unit, then close the service valves and remove both units carefully.

  3. 3

    Seal holes and transport

    We close the old wall cores with suitable material so they do not let in hot air or insects, then transport both units to the new location.

  4. 4

    Refit, vacuum and start

    We mount both units, run Mueller copper in runs of up to 30 metres without welded joints, vacuum the line, test the joints, then release the saved refrigerant and verify cooling with you present.

Proper removal or an unprepared one?

AlrabihThe usual way
RefrigerantSaved by pump-downLost to the air
Copper pipesCapped at removalOpen, moisture enters
Old holesSealed after removalLeft open, air leaks in
New-site copperNew Mueller, insulatedOld copper reused
Drain at new siteDrain fall planned at surveyLeft to chance during fitting

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Mustaqbal is a newly developed area with spacious, well-spaced villas on large plots, wide regular streets and available parking, making access straightforward and movement between neighbouring properties safe. Removal and refitting work here is the least complex because ample space allows transport to proceed comfortably, and level, secure rooftops provide reliable positions for outdoor units without future maintenance concerns.

Al Mustaqbal is in south Jeddah, a modern area of spacious, well-spaced villas with wide, regular streets.

Most villas here have independent splits per room, with outdoor units on safe, spacious roofs.

The AC setup in Al Mustaqbal

  1. 1

    Individual split per villa room

    Most Al Mustaqbal villas have separate splits per room, making relocation to a new villa straightforward.

  2. 2

    Outdoor units on broad, secure roofs

    The spacious, secure rooftops of Al Mustaqbal villas provide reliable positions for outdoor units without constraints.

  3. 3

    Sufficient space between villas for work and maintenance

    The wide spacing between villas gives the team ample safe working room around outdoor units without concern.

Before the visit

Before our visit in Al Mustaqbal

  1. 1

    Confirm the new villa's address and garden entrance

    Send us the exact address, the garden entrance the team will use, and available outdoor space before the appointment.

  2. 2

    Prepare the new outdoor unit location

    Decide where you want the outdoor unit on the roof or wall, and ensure the area is clear of obstacles and furniture.

  3. 3

    Check the new villa's electrics and available circuits

    Ensure the new villa has a dedicated circuit for the AC or can safely take a new cable.

FAQ

Questions about AC removal & refitting

Can the old copper pipes be reused at the new site?

It depends on the condition of the pipes and the layout at the new site. If the pipes are free of oxidation and insulation cracking, and the length fits the new run, they can be reused after inspection. If the new site needs a longer route or the existing pipes show wear, fresh Mueller copper pipe at 99% pure copper is run to suit the new layout. The site survey decides.

Why not just remove the unit without pumping down first?

Before any connection is opened, the compressor is run to pump the refrigerant charge into the outdoor unit and the service valves are closed on it. If the connections are opened first, the refrigerant escapes into the air and is lost entirely, which is both costly and harmful to the environment. Pumping down first keeps the full charge sealed inside the outdoor unit, ready to use at the new site.

What happens to the old wall hole after the unit is removed?

Once the pipes and cable are pulled out, the hole is cleared of insulation remnants and sleeve material, then sealed with a filler suited to the wall type, whether concrete, brick or gypsum board. The aim is a tight closure that stops humid air and insects from entering and leaves the wall surface clean before the site is handed back.

Can a unit be moved to a different floor in the same building?

Yes, but moving to a different floor means a completely new pipe route, a different cable length, and possibly a changed drain line fall. The site survey defines the pipe path, the required run length and the outdoor unit position. Mueller copper pipe at 99% pure copper is then laid along a route that accounts for the floor difference, and a vacuum test and pressure test are carried out before the unit is started.

Can a unit be moved to a different floor in the same building?

Yes, but a different floor changes the copper run length, the drain route and where the outdoor unit is fixed. At the survey we establish whether extra copper is needed and where the drain can fall correctly, then plan the full route before any removal begins.

The new villa is further away, will longer copper lines affect cooling?

If the distance exceeds the optimal range, cooling may drop slightly, but we vacuum and test the system precisely to ensure performance.

The new villa gets more direct sun, does this affect the outdoor unit position?

Yes, we choose a partly shaded spot if possible, or use a solar shade to improve efficiency in high heat.

Can you move my AC between two Al Mustaqbal villas in one day?

Yes, if the villas are close and the new locations are ready, we can complete the work in one visit.

The new villa has its own drainage system, will this affect the outdoor unit connection?

No, we identify the existing drainage point and properly coordinate it with the outdoor unit's drainage system.

The Jeddah corniche in cool weather

Move your unit without losing the charge

WhatsApp us your current and new locations and we will book a survey to plan the move, Saturday to Thursday.

CallWhatsApp