Chiller and AHU installation
Chiller & AHU installation in Al Abeer
In Al Abeer, north Jeddah, chiller and AHU installation demands precision because modern commercial and hotel buildings cannot tolerate installation faults. Alrabih's team isolates units from vibration, fully insulates and aluminium-clads the chilled water pipework, and runs commissioning before handover.
- Vibration isolation
- Aluminium cladding
- Full commissioning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need this installation
- 1
A new commercial or government building
The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.
- 2
An existing unit vibrates and makes noise
Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.
- 3
Extending an existing building
Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.
Who it's for
Building a hospital or hotel that needs a central cooling plant
We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.
Ask on WhatsAppReplaced an old chiller but connections do not match
We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.
Ask on WhatsApp
What the installation covers
- Chiller lifted onto isolated base
- Chilled pipework run and insulated
- Aluminium cladding of pipework
- AHUs mounted and duct-connected
- Pressure test and commissioning
How we work
How we work
- 1
Site survey and design
We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.
- 2
Base preparation and lifting
We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.
- 3
Pipework and ductwork
We run the chilled water pipes, insulate them and clad them in aluminium sheet to resist Jeddah's humid salty air, then connect each AHU to its duct network.
- 4
Pressure test and commissioning
We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.
Considered installation or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Chiller base | Isolators matched to the site | Bolted straight to concrete |
| Pipe insulation | Full insulation with aluminium cladding | Partial or left bare |
| Pipe test | Pressure test before start-up | Started without testing |
| Air balancing | Measured and dampers adjusted | Unbalanced airflow |
| Transition pieces | Fabricated in our own workshop | Improvised or ill-fitting |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Abeer hosts modern commercial and hotel buildings with solid foundations and defined rooftops, allowing chillers to be mounted on vibration-isolated bases with precision. The wider spacing between buildings makes moving heavy equipment and pipework easier than in older districts. The suspended ceiling design in these buildings demands full insulation of pipework to prevent condensation leaks onto ceilings and spaces below.
Al Abeer lies in north Jeddah, an area of modern commercial and hotel buildings with wider planning and solid structural foundations.
Most commercial and hotel buildings in Al Abeer use central chiller systems with duct networks distributed across multiple storeys.
The AC setup in Al Abeer
- 1
Central chiller system on the rooftop
The chiller is mounted on a fully isolated base on the rooftop, with insulated aluminium-clad chilled water pipes running down to the building's floors.
- 2
Duct networks distributed across storeys
Air handling units distribute chilled air through insulated ducts to retail spaces, offices and service areas across each floor.
- 3
Full insulation system for pipes and ducts
All pipework and ducts are insulated with foam and aluminium cladding to prevent condensation and heat loss.
Before the visit
Before our visit in Al Abeer
- 1
Obtain approved design drawings
Provide us with the approved engineering drawings from the supervising engineer before work begins.
- 2
Confirm chiller mounting and duct routing
Confirm the chiller mounting location on the rooftop and duct routing through storeys with the site supervision team.
- 3
Coordinate with the contractor to close ceilings after installation
Agree with the contractor on installation timing so suspended ceilings are not closed until ducts are fully installed and insulated.
More districts for Chiller & AHU installation
Other services in Al Abeer
FAQ
Questions about Chiller & AHU installation
How is the chiller unit lifted to the roof?
The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.
Why do chilled water pipes need aluminium cladding in Jeddah?
Chilled water pipes carry cold water through hot, humid, salty air. Without external protection, insulation deteriorates from moisture and salt and loses effectiveness. Aluminium cladding protects the insulation from outdoor air on rooftops and the humid interior air found in coastal buildings like those in Jeddah.
Can you connect AHUs to an existing duct network?
Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.
What does system commissioning involve?
After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.
What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?
A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.
Can a chiller be safely mounted on a modern building's rooftop?
Yes, we mount the chiller on a vibration-isolated base, which protects the pipework and joints from damage and reduces noise transmission.
Chilled water pipework runs under suspended ceilings, how do you protect it from leaks?
We fully insulate the pipework and cover it with aluminium cladding to prevent condensation forming, keeping the ceilings and finishes below dry.
Do you run a commissioning test before final handover?
Yes, we test the entire system, pressure, flow and temperature, before handover to ensure peak performance.
How do you coordinate with the contractor and engineer during installation in a building under construction?
We request design drawings in advance and coordinate with the site team to install bases and ducts before ceilings and walls are closed.












































































