In Al Hijrah, north-east Jeddah, chiller and AHU installation in large buildings, hotels, hospitals, commercial complexes, demands precision work. Alrabih mounts the chiller on vibration-isolated bases and orchestrates the piping and duct network carefully to ensure smooth operation.

  • Vibration isolation
  • Aluminium cladding
  • Full commissioning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When you need this installation

  1. 1

    A new commercial or government building

    The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.

  2. 2

    An existing unit vibrates and makes noise

    Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.

  3. 3

    Extending an existing building

    Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.

Who it's for

  • Building a hospital or hotel that needs a central cooling plant

    We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.

    Ask on WhatsApp
  • Replaced an old chiller but connections do not match

    We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.

    Ask on WhatsApp

What the installation covers

  • Chiller lifted onto isolated base
  • Chilled pipework run and insulated
  • Aluminium cladding of pipework
  • AHUs mounted and duct-connected
  • Pressure test and commissioning
Request a quote

How we work

How we work

  1. 1

    Site survey and design

    We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.

  2. 2

    Base preparation and lifting

    We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.

  3. 3

    Pipework and ductwork

    We run the chilled water pipes, insulate them and clad them in aluminium sheet to resist Jeddah's humid salty air, then connect each AHU to its duct network.

  4. 4

    Pressure test and commissioning

    We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.

Considered installation or a rushed one?

AlrabihThe usual way
Chiller baseIsolators matched to the siteBolted straight to concrete
Pipe insulationFull insulation with aluminium claddingPartial or left bare
Pipe testPressure test before start-upStarted without testing
Air balancingMeasured and dampers adjustedUnbalanced airflow
Transition piecesFabricated in our own workshopImprovised or ill-fitting

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Hijrah hosts large commercial and hospitality projects, including hotels and hospitals with complex centralised cooling systems spanning multiple floors. Installing the chiller on isolation bases, fully insulating the pipework with aluminium cladding, and connecting each AHU to its duct network is essential here to prevent vibration transfer and heat loss, especially under the high cooling loads these buildings carry year-round. Coordinating with project managers and meeting tight schedules is critical to the work's success.

Al Hijrah lies in north Jeddah, a modern district built around large hotels, hospitals and multi-storey commercial buildings.

Most large projects here use a central chiller system with AHU units distributed across the floors.

The AC setup in Al Hijrah

  1. 1

    Central chiller with insulated chilled-water piping

    The large hotels and hospitals in Al Hijrah rely on a central chiller that distributes chilled water through aluminium-clad piping to each floor.

  2. 2

    AHU units per floor

    Each AHU takes chilled water from the chiller and distributes it across the floor's duct network and vents.

  3. 3

    Chiller vibration isolation on the roof

    The chiller is usually roof-mounted, so we use isolation bases to reduce impact transfer to the building's frame.

Before the visit

Before our visit in Al Hijrah

  1. 1

    Confirm roof space for the chiller unit

    Verify the roof has adequate space and clear ventilation for the chiller, and that no walls or obstructions block air intake to the unit.

  2. 2

    Confirm the piping route through the building

    Agree with the engineer and contractor on the horizontal and vertical piping routes and insulation placement, especially if suspended ceilings are tight or structural constraints exist.

  3. 3

    Verify adequate electrical supply for the chiller

    Confirm the dedicated electrical circuit for the chiller is adequate in voltage and amperage, and that the control panel is safely connected before system start-up.

FAQ

Questions about Chiller & AHU installation

How is the chiller unit lifted to the roof?

The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.

Why do chilled water pipes need aluminium cladding in Jeddah?

Chilled water pipes carry cold water through hot, humid, salty air. Without external protection, insulation deteriorates from moisture and salt and loses effectiveness. Aluminium cladding protects the insulation from outdoor air on rooftops and the humid interior air found in coastal buildings like those in Jeddah.

Can you connect AHUs to an existing duct network?

Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.

What does system commissioning involve?

After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.

What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?

A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.

How do you mount the chiller to prevent vibration in the hotel?

We mount the chiller on a vibration-isolated base, which cuts off vibration transmission to the building's structure and keeps the guests comfortable.

Our hospital spans many floors, how do you run the insulated piping from the chiller to the upper levels?

We run the aluminium-clad insulated piping vertically through the service risers, managing pipe lengths to minimise heat loss and condensation on the suspended ceilings.

Does Jeddah's high humidity affect the insulated piping in the hotel?

Yes, but proper aluminium-clad insulation shields the piping from condensation and stops moisture building up on ceilings and walls.

Do you test the entire system before handing over the hotel or hospital?

Yes, we run a full commissioning test and liaise with the project team to confirm each AHU is correctly connected and operating to spec.