Freezer and dual-temp rooms
Cold & freezer room installation in Al Muntazah
In Al Muntazah, east Jeddah, food shops, bakeries and ice factories need large-capacity freezer rooms for daily stock storage. Alrabih designs the room with heavy insulation and a strong floor to withstand substantial loads and continuous use.
- Frost-proof floor
- Auto defrost
- Two-zone layout
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Who needs a specialist freezer room?
- 1
Stock that needs sub-zero cold
Meat, poultry, fish and ice cream spoil if the temperature rises even briefly above the required level. A freezer room is built to hold that level continuously, not simply to cool.
- 2
One room, two temperature zones
Large restaurants and hotels usually need a chiller section and a freezer section side by side. We build both wings with separate insulation, independent refrigeration units and an insulated inner door, so neither zone affects the other's temperature.
- 3
Expanding an existing facility
If your current cold room no longer holds all your stock, or you need to add a freezer section beside it, we survey the site and propose the most practical way to expand with as little disruption to your operation as possible.
Who it's for
Opening a restaurant that needs a freezer room
We survey your kitchen and build the freezer room with frost-rated insulation panels, an insulated floor and a tight-sealing door.
Ask on WhatsAppNeed a chiller wing and a freezer wing together
We build both wings with separate insulation, independent refrigeration units and an insulated inner door between them.
Ask on WhatsApp
What the installation covers
- Freezer-rated insulation panels
- Insulated floor vapour barrier
- Heated frame tight-sealing door
- Evaporator with electric defrost
- Condensing unit temperature controller
How we work
How we work
- 1
Site survey
We visit the site, learn the stock type and required temperature, measure the available space, and decide the right insulation thickness and refrigeration system from what we find.
- 2
Design and supply
We draw the room layout including pipe and cable routes, then have the panels, doors and equipment ready before installation begins.
- 3
Installation and connection
We fit the panels, insulated floor and door, then run and insulate the copper pipes, vacuum the line and pressure-test it before starting the system. Mueller copper in runs of up to 30 metres without welded joints where the layout calls for it.
- 4
Start-up and handover
We run the system and watch the room reach its target temperature, confirm the defrost cycle works and the door seals properly, then explain the controls to the person responsible for the facility.
Specialist install or an unconsidered one?
| Alrabih | The usual way | |
|---|---|---|
| Floor | Insulated with vapour barrier | Plain floor that cracks |
| Door frame | Heated to prevent seizure | Freezes and warps |
| Evaporator | Scheduled electric defrost | Ice blocks the airflow |
| Insulation | Thickness set at survey | Same thickness for every room |
| Anteroom | Buffer zone reduces air ingress | Direct door into freezer |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Muntazah is a growing commercial and industrial zone in east Jeddah, with food shops, bakeries, ice factories and small workshops, mostly in newer and wider buildings than central districts. Rooms here need larger capacity because shops and factories stock high volumes of frozen goods, and floors carry heavy equipment and stacked inventory loads. Spaces are generally ample, allowing for bigger rooms and more powerful cooling systems.
Al Muntazah is in east Jeddah and is characterised by a concentration of food shops, bakeries, ice factories and light industrial activity.
Freezer rooms here are typically large-scale with 10-tonne-plus capacity, since factories and large shops need substantial inventory storage.
The AC setup in Al Muntazah
- 1
Large-scale freezer room with high capacity
Ice factories and large shops in Al Muntazah need rooms of 10 tonnes-plus capacity to store substantial daily production.
- 2
Two-zone room for different product types
Some factories and shops divide the room into a zone for ice or heavily frozen goods and another for less frozen items.
- 3
Insulated floor with heavy-duty support
Heavy loads from inventory and equipment require a thick insulated floor with additional support structure underneath.
Before the visit
Before our visit in Al Muntazah
- 1
Inspect the foundation and electrical capacity
Ensure the building foundation can bear the weight of the large room and inventory, and that total electrical capacity is adequate for a heavy cooling system.
- 2
Define the exact space and expected inventory
Precise measurements and clarity on expected inventory volume help us design a room of optimal size.
- 3
Confirm access for machinery and equipment
Verify that aisles and doorways allow heavy equipment, cooling units and inventory to enter during installation.
More districts for Cold & freezer room installation
Other services in Al Muntazah
FAQ
Questions about Cold & freezer room installation
Why does a freezer room need an insulated floor when a chiller often does not?
At sub-zero temperatures the moisture held in a concrete slab freezes and expands, cracking tiles and lifting bases over time. A chiller room operates above freezing, so ice crystals do not form in the slab. A freezer room therefore requires insulated panels under the floor together with a vapour barrier that blocks rising ground heat and protects the structure over the long term.
What is the difference between electric defrost and other types?
Electric defrost uses heating elements fixed inside the evaporator coil; they warm the coil directly and melt frost build-up. Hot-gas defrost instead redirects warm refrigerant from the compressor back through the same coil. The choice between the two depends on room size, the required number of cycles and the type of goods stored; the site survey determines which method suits each installation.
Can two zones at different temperatures share the same footprint?
Yes. A partition of insulated panels separates the space, with each side using a panel thickness matched to its required temperature differential. Each zone has its own refrigeration unit and a door with a heated frame to prevent condensation. This arrangement is widely used in meat and fish facilities that need a chiller zone for short-term stock and a freezer zone for longer storage. The final design depends on the available floor area and the heat load of each section.
Does the position of the condensing unit affect how the freezer room performs?
Position has a direct effect. The condensing unit needs clean air and adequate flow to reject heat; if it is placed in a confined space or near heat sources the condensing pressure rises and the compressor works harder. In Jeddah, outdoor air also carries salt and dust that accumulate on the condenser coil over time. The site survey identifies the best location and the copper-pipe route, keeping each Mueller copper pipe run within thirty metres without welded joints.
Does the position of the condensing unit affect how the freezer room performs?
Position has a direct effect. The condensing unit needs clean air and adequate flow to reject heat; if it is placed in a confined space or near heat sources the condensing pressure rises and the compressor works harder. In Jeddah, outdoor air also carries salt and dust that accumulate on the condenser coil over time. The site survey identifies the best location and the copper-pipe route, keeping each Mueller copper pipe run within thirty metres without welded joints.
What is the largest freezer room size you can build in Al Muntazah?
There is no set maximum, it depends on available space, expected load and the cooling system needed, and we design it to match your factory or shop's needs.
An ice factory floor bears very heavy loads; how do you select it?
We choose heavy-duty insulated flooring that resists substantial loads, frost and moisture, and recommend additional support if the expected inventory is very large.
East Jeddah's summer heat is extreme; will the cooling be sufficient?
We size the cooling capacity by room volume, daily load and external heat, and select a powerful system that maintains the required temperature even in intense summer.
How do you handle water leaks and drainage from such a large room?
We survey the building, foundation and external drainage before design, and install a sealed drainage system with insulated pipes and safety valves to prevent leaks.












































































