Freezer and dual-temp rooms
Cold & freezer room installation in Industrial City
In Industrial City, south Jeddah, cold and freezer room installation serves meat, fish and poultry factories and large food storage warehouses. Alrabih's team designs rooms with high capacity, reliable cooling systems and precise temperature control.
- Frost-proof floor
- Auto defrost
- Two-zone layout
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Who needs a specialist freezer room?
- 1
Stock that needs sub-zero cold
Meat, poultry, fish and ice cream spoil if the temperature rises even briefly above the required level. A freezer room is built to hold that level continuously, not simply to cool.
- 2
One room, two temperature zones
Large restaurants and hotels usually need a chiller section and a freezer section side by side. We build both wings with separate insulation, independent refrigeration units and an insulated inner door, so neither zone affects the other's temperature.
- 3
Expanding an existing facility
If your current cold room no longer holds all your stock, or you need to add a freezer section beside it, we survey the site and propose the most practical way to expand with as little disruption to your operation as possible.
Who it's for
Opening a restaurant that needs a freezer room
We survey your kitchen and build the freezer room with frost-rated insulation panels, an insulated floor and a tight-sealing door.
Ask on WhatsAppNeed a chiller wing and a freezer wing together
We build both wings with separate insulation, independent refrigeration units and an insulated inner door between them.
Ask on WhatsApp
What the installation covers
- Freezer-rated insulation panels
- Insulated floor vapour barrier
- Heated frame tight-sealing door
- Evaporator with electric defrost
- Condensing unit temperature controller
How we work
How we work
- 1
Site survey
We visit the site, learn the stock type and required temperature, measure the available space, and decide the right insulation thickness and refrigeration system from what we find.
- 2
Design and supply
We draw the room layout including pipe and cable routes, then have the panels, doors and equipment ready before installation begins.
- 3
Installation and connection
We fit the panels, insulated floor and door, then run and insulate the copper pipes, vacuum the line and pressure-test it before starting the system. Mueller copper in runs of up to 30 metres without welded joints where the layout calls for it.
- 4
Start-up and handover
We run the system and watch the room reach its target temperature, confirm the defrost cycle works and the door seals properly, then explain the controls to the person responsible for the facility.
Specialist install or an unconsidered one?
| Alrabih | The usual way | |
|---|---|---|
| Floor | Insulated with vapour barrier | Plain floor that cracks |
| Door frame | Heated to prevent seizure | Freezes and warps |
| Evaporator | Scheduled electric defrost | Ice blocks the airflow |
| Insulation | Thickness set at survey | Same thickness for every room |
| Anteroom | Buffer zone reduces air ingress | Direct door into freezer |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Industrial City is dense with large food factories, warehouses and specialised storage, with relatively wide outdoor spaces and strong level floors built to handle heavy loads. Most factories need very large freezer rooms with capacities of 10 tons daily or more, and often require multiple rooms or multi-section designs. The heat and humidity from intensive factory operations put high stress on the cooling system, so regular strong maintenance is essential.
Industrial City, in south Jeddah, is a dense industrial zone with advanced food factories and production lines.
Most freezer rooms here are very large, handling 5 to 15 tons daily, with dual or multiple cooling systems for reliability and backup.
The AC setup in Industrial City
- 1
Large multi-section freezer room
Large factories install a huge room with separate sections for different product types, each at its own temperature as needed.
- 2
Dual or multiple cooling system
Large factories install two or more compressor units in one system to ensure cooling continues even if one fails.
- 3
Advanced drainage and humidity removal system
The room includes strong drainage pumps and high-capacity humidity removal to handle the factory's damp and dusty environment.
Before the visit
Before our visit in Industrial City
- 1
Prepare site and foundation study
Tell us the factory layout, planned room location, floor load and proximity to production lines, and send photos of the site.
- 2
Confirm access points, electricity and drainage
Tell us the nearest entry point for equipment, the location of the main electrical panel and available water drainage points.
- 3
Coordinate with factory management
Arrange with us the best installation time without disrupting production lines, and tell us about any factory safety requirements or precautions.
More districts for Cold & freezer room installation
Other services in Industrial City
FAQ
Questions about Cold & freezer room installation
Why does a freezer room need an insulated floor when a chiller often does not?
At sub-zero temperatures the moisture held in a concrete slab freezes and expands, cracking tiles and lifting bases over time. A chiller room operates above freezing, so ice crystals do not form in the slab. A freezer room therefore requires insulated panels under the floor together with a vapour barrier that blocks rising ground heat and protects the structure over the long term.
What is the difference between electric defrost and other types?
Electric defrost uses heating elements fixed inside the evaporator coil; they warm the coil directly and melt frost build-up. Hot-gas defrost instead redirects warm refrigerant from the compressor back through the same coil. The choice between the two depends on room size, the required number of cycles and the type of goods stored; the site survey determines which method suits each installation.
Can two zones at different temperatures share the same footprint?
Yes. A partition of insulated panels separates the space, with each side using a panel thickness matched to its required temperature differential. Each zone has its own refrigeration unit and a door with a heated frame to prevent condensation. This arrangement is widely used in meat and fish facilities that need a chiller zone for short-term stock and a freezer zone for longer storage. The final design depends on the available floor area and the heat load of each section.
Does the position of the condensing unit affect how the freezer room performs?
Position has a direct effect. The condensing unit needs clean air and adequate flow to reject heat; if it is placed in a confined space or near heat sources the condensing pressure rises and the compressor works harder. In Jeddah, outdoor air also carries salt and dust that accumulate on the condenser coil over time. The site survey identifies the best location and the copper-pipe route, keeping each Mueller copper pipe run within thirty metres without welded joints.
Does the position of the condensing unit affect how the freezer room performs?
Position has a direct effect. The condensing unit needs clean air and adequate flow to reject heat; if it is placed in a confined space or near heat sources the condensing pressure rises and the compressor works harder. In Jeddah, outdoor air also carries salt and dust that accumulate on the condenser coil over time. The site survey identifies the best location and the copper-pipe route, keeping each Mueller copper pipe run within thirty metres without welded joints.
We have multiple production lines, do we need separate rooms or one large one?
It depends on the product type and daily output, so we recommend a site visit to assess demand, available space and design the best solution.
Our floor bears very heavy loads, what kind of foundation do we need?
We conduct a detailed load study before installation and fit a reinforced insulated foundation with steel bracing to handle heavy weight and factory vibrations.
Should we have multiple cooling units for reliability and backup?
Yes, we recommend dual or multiple systems for large factories so production continues if one unit fails.
Production humidity affects the room, how do we manage it?
We install very strong drainage, advanced humidity removal and regular airflow between the room and production floor to prevent ice and mould buildup.












































































