Desert cooler, proper duct
Evaporative (desert) duct installation in Obaid
In Obaid, south Jeddah, evaporative duct installation suits the large open warehouses and workshops that need low-cost cooling. We carefully open and seal the roof against rain and dust, run galvanised duct across the space, and the site survey confirms whether evaporative cooling fits your area.
- Sealed roof
- Galvanised duct
- Air changes
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need evaporative cooler duct
- 1
A large workshop or warehouse
Large industrial spaces get very hot in Jeddah summers and split units are expensive to run there. An evaporative cooler with distribution duct brings air to work areas at lower running cost, provided the space is ventilated and not sealed shut.
- 2
A majlis tent or seasonal space
Outdoor majlis areas and seasonal tents do not suit split AC units because of the structure. Evaporative duct delivers a cool air stream as long as the space is open enough for air changes, which the survey confirms.
- 3
Old duct with poor airflow
Old sheet duct cracks over time and air leaks from the joints before reaching the space. On site we check whether the problem is leaking duct, poor distribution, or the cooler size itself.
Who it's for
Need to cool a large workshop at reasonable running cost
We survey the workshop and check its ventilation, then run galvanised duct from the roof cooler to the work areas with exhaust openings that keep air moving through the space.
Ask on WhatsAppYou have an outdoor majlis that needs seasonal cooling
We check how open the majlis is and assess its structure, then design the duct route and exhaust openings so cool air reaches the seating area without humid air building up inside.
Ask on WhatsApp
What the work covers
- Weatherproof roof collar fitted
- G90 galvanised duct runs
- Branch and air outlet connections
- Exhaust openings for air changes
- Airflow check after start-up
How we work
How we work
- 1
Site survey first
We visit, measure the space and check how open it is, because evaporative cooling needs enough ventilation; without it humidity rises inside and the cooling effect drops.
- 2
Plan the duct route
We plan the main duct run, branches, air outlet positions and exhaust opening locations, and show you the layout before any work starts.
- 3
Install duct and seal roof
We open the roof, fit and seal the collar against leaks, then run the galvanised duct and hang it on proper supports so it does not sag.
- 4
Start-up and test
We run the evaporative cooler and check that air reaches every outlet and that the exhaust openings are working so fresh air is visibly moving through the space.
Planned duct or a quick run?
| Alrabih | The usual way | |
|---|---|---|
| Roof seal | Weatherproof, sealed collar | Silicone that cracks in heat |
| Sheet | G90 galvanised | Unspecified gauge |
| Exhaust | Sized openings for air changes | Left to chance |
| Space suitability | Confirmed by survey | Not checked |
| Duct supports | Fixed hangers along the full run | Duct left unsupported |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Obaid is a mixed industrial and residential area dominated by warehouses, workshops and small to medium factories with high ceilings and open gaps between buildings. These structures benefit from evaporative cooling because the relatively drier air in the south reduces the electrical load, but a preliminary survey is essential to check ceiling height, existing wiring and the distance between exhaust openings and neighbouring residential areas.
Obaid lies in Jeddah's industrial south, a district of warehouses and workshops with high ceilings and broad floor spans.
Most warehouses in Obaid need large-diameter duct (500 mm or larger) to cover the broad spaces efficiently.
The AC setup in Obaid
- 1
Large-diameter evaporative duct
The broad warehouses in Obaid need galvanised duct panels 500 mm or larger to distribute cooling with high efficiency.
- 2
Multiple duct runs from single cooler unit
Large floor plans require multiple duct branches from a single roof-top unit, with exhaust openings distributed around the warehouse.
- 3
Duct insulation against intense heat
Metal roofs in Obaid reflect intense heat, so duct insulation cuts cooling loss during distribution.
Before the visit
Before our visit in Obaid
- 1
Clear the roof of obstacles
Make sure the roof is clear of other items and equipment, and tell us about any existing structures or wiring beforehand.
- 2
Provide safe roof access
Check that the roof access ladder or temporary steps are safe, and tell us of any security restrictions beforehand.
- 3
Specify exhaust opening locations
Tell us where you prefer exhaust openings (external walls or roof) and confirm no residential neighbours sit directly below them.
More districts for Evaporative (desert) duct installation
Other services in Obaid
FAQ
Questions about Evaporative (desert) duct installation
Does evaporative cooling work in Jeddah in summer?
Evaporative cooling relies on water evaporation and weakens when humidity is high. In Jeddah, humidity is higher near the coast and lower inland. The survey decides whether the space and the season are suitable, which is why we do not start before visiting the site.
Why do exhaust openings matter as much as the duct runs?
An evaporative cooler pushes fresh air in continuously. Without an exit path, humid air builds up inside and the felt temperature rises. Properly sized exhaust openings keep air moving through, not piling up, and that is the core of how this type of cooling works.
What sheet do you use for the duct?
We use G90 galvanised steel sheet, which resists rust in Jeddah's humid and salty air. The duct sections are formed in our workshop before being taken to site, then hung on supports along the run to stop them sagging.
Can one cooler supply duct to more than one area?
Duct can be branched from one unit to more than one outlet, but each branch reduces the airflow at every opening. The survey decides whether the cooler has enough output for the total area, or whether a separate unit for each wing is the better answer.
Can evaporative cooler duct run through a false ceiling?
Evaporative cooling depends on continuous air movement and exchange, which requires exhaust openings in the same space the duct serves. A false ceiling restricts that flow unless dedicated openings lead air out of the building. The site survey decides whether the structure allows it, because the duct run and the exhaust are designed together as one system, not separately.
Would evaporative cooling suit my warehouse in Obaid?
Evaporative cooling works very efficiently in large open warehouses with high ceilings, but depends on outdoor air humidity. Our site survey determines whether it is the right choice for your location.
How do you run duct up a tall warehouse roof?
We use safe metal support frames to fix the galvanised duct to the tall roof, and ensure secure installation before operation.
Metal roofs here heat up fast, does this affect the duct?
Thermal expansion of metal roofs does not affect the galvanised duct if it is installed correctly, and the survey identifies the safest fixing points.
My roof needs repair before installation, do you handle roof sealing?
We carefully open, clean and seal the roof against rain and dust, but if structural repair is needed, we recommend coordinating with a building specialist before installation.












































































