Window unit to split
Window-to-split conversion in Industrial City
In Industrial City, south Jeddah, converting window units to split removes noise and heat loss from offices and workshops. We fully seal the opening and fit the split through a separate neat hole.
- Sealed opening
- Window restored
- Quiet split
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Why owners make the switch
- 1
Non-stop noise from the old unit
The window unit motor runs right inside the room, and the vibration gets worse over the years. Many owners say sleeping next to it has become impossible, and switching to a split removes the source entirely.
- 2
The wall opening lets in heat and dust
The foam and tape sealing the gap around a window unit frame degrade in Jeddah's salty, humid air. The large opening becomes a clear source of heat loss, dust in the windy season and sometimes rain in winter.
- 3
The blocked window darkens the room
A window unit fills the whole window or most of it, so the room loses its natural light and ventilation at times when you do not need cooling. Getting the window back fully changes the room noticeably.
Who it's for
Own a villa and want the windows back
We remove the window units from your villa rooms, close each opening with block, insulation and plaster, then fit a split in each room through its own core hole.
Ask on WhatsAppManaging a rental flat and want to raise its value
We convert the flat's window unit to a quiet split and restore the wall and window to their original condition, improving the unit for the next tenant.
Ask on WhatsApp
What the conversion covers
- Remove old unit and frame
- Block plaster and insulation
- Paint inside and outside
- New core hole for split
- Insulated copper and drain
How we work
How we work
- 1
Survey the wall and opening
We check the wall thickness and the build around the old opening, agree where the new core hole for the split goes away from the old frame, and decide where the outdoor unit will sit.
- 2
Remove and close
We remove the window unit and its frame without breaking the surrounding wall, then close the opening with blockwork or lightweight concrete to match the original construction, with thermal insulation set inside the layers before plastering.
- 3
Plaster and paint both sides
We plaster and paint the closed opening on both the inside and outside faces to match the existing wall, leaving no trace of the old opening that could let in air or moisture.
- 4
Fit the new split
We core the agreed spot for the split, run insulated Mueller copper and a drain line with the correct fall, vacuum the line before start-up and test everything with you present.
A proper seal or a quick patch?
| Alrabih | The usual way | |
|---|---|---|
| Closing the opening | Block, plaster and insulation | Foam or a timber board |
| Outside face | Plastered and painted flush | Visible mark or cracks |
| Thermal insulation | Inside wall before plastering | None |
| New split core hole | Chosen away from old frame | Wherever drilling is easiest |
| Outside paint | Matched to existing wall colour | Different colour or unpainted |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Industrial City mixes modern office buildings with warehouses and workshops, and many offices and older blocks have window units in their windows. The hot, humid weather and industrial dust make these units deteriorate fast, and window noise affects the working environment. Converting to split gives better cooling, stronger noise control and a tight seal that protects from dust and leaks.
Industrial City is in south Jeddah, a district of office buildings, workshops and warehouses exposed to industrial dust and humidity.
Most older workshops and offices in Industrial City have one or more window units in reception areas and office rooms.
The AC setup in Industrial City
- 1
Secure sealing with heavy-duty insulation
We seal the opening with thermal brick and thick acoustic insulation, suited to industrial buildings and workshops.
- 2
Protected hole for split pipes with dust cover
We drill with a protective dust cover around the pipes and cable to prevent fine particles entering.
- 3
Outdoor unit with reinforced dust-proof filters
We select units with extra filters and enhanced protection, suited to industrial environments and fine dust.
Before the visit
Before our visit in Industrial City
- 1
Confirm outdoor unit location on roof or wall
Decide if the outdoor unit will go on the roof or an external wall, and send a photo of the location.
- 2
Prepare the site and clear obstructions
Clear space around the window and wall, and make sure no equipment or cables block access.
- 3
Schedule installation with site management
Notify the site or building manager in advance so they can arrange access and safety clearance.
More districts for Window-to-split conversion
Other services in Industrial City
FAQ
Questions about Window-to-split conversion
Do you restore the original window after closing the AC opening?
It depends on what the original opening was. In some rooms the opening was cut into a solid wall with no window frame, so it is fully closed. If the original build can take a window, we discuss that at the survey and tell you what is actually possible in your wall.
Can the old window unit hole be reused as the new split core hole?
The old opening is usually much larger than the small core a split needs, and its position may not suit the copper and drain route. It is safer to close it fully and drill a new hole in the right place, so no hidden gaps remain to let air through or collect moisture.
How do you stop humid salty air coming through the closed opening?
We place thermal insulation inside the wall layers before plastering, and use sealing materials that form a continuous barrier from inside to outside. Jeddah's combination of humidity and salt accelerates the breakdown of any temporary patch, so we treat the closed opening as a new wall section, not a surface repair.
Do I need permission from the building management before closing the opening?
In a rented flat it is wise to check with the owner or management office first, because the work changes the building's outside face. In a villa you own the decision is yours. We explain the full scope at the survey so you can get any approval needed before the work day.
Does the job change if the wall is concrete rather than block?
Yes. A concrete wall needs a different filling method and may require a repair mix rather than standard block. We identify the wall type at the survey and choose the material that bonds solidly with the existing concrete, leaving no hidden gaps for moisture to enter later.
Industrial dust enters through window gaps, will split stop it?
Yes, fully sealing the old opening stops dust entry completely, and the new split has filters that block fine dust.
In a workshop, is split noise lower than the window unit?
Much lower, modern split is 15 to 20 decibels quieter than the window unit, which noticeably improves the work environment.
Does industrial dust affect split efficiency?
Regular cleaning of filters and coil maintains efficiency, and we recommend monthly cleaning in an industrial setting.
Does split installation require shutting down operations?
Installation takes 4 to 6 hours depending on the site, and can be scheduled outside peak hours or on a weekend.












































































