Warehouse Cooling

Warehouse HVAC in Al Farouq

In Al Farouq, south Jeddah, textile and general merchandise warehouses struggle with heat and humidity year-round. We select cooling systems that balance temperature and humidity control to protect goods and workers alike.

  • Zone control
  • Stock protection
  • Directed ventilation

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When your warehouse needs a proper HVAC system

  1. 1

    Heat that damages stored stock

    Food, pharmaceutical and electronics stock all have storage temperature limits. When a metal warehouse roof bakes under Jeddah's sun, the air inside becomes a direct threat to shelf life and product quality. The solution starts with a survey of the racking layout to find the critical zones.

  2. 2

    Workers overheating in the picking area

    Workers in the picking and loading area move constantly under a hot roof. Natural ventilation alone is not enough in summer. We choose between direct cooling and evaporative cooling based on a site survey and the indoor humidity level.

  3. 3

    Warehouse offices that are never comfortable

    Supervisor and reception offices have different needs from the large storage hall. Putting them on one system raises cost and weakens performance in both areas. We give the office zone its own system and link it to the warehouse with pressure-control points.

Who it's for

  • Storing heat-sensitive stock in a warehouse

    We locate the critical zone in the racking layout and design an independent cooling system with its own controls, keeping that area at a safe temperature separate from the rest of the warehouse.

    Ask on WhatsApp
  • Building a new warehouse and need HVAC from the start

    We join the project at design stage before the roof closes, mapping cooling zones, ventilation and duct routes to fit the racking plan and loading doors from the outset.

    Ask on WhatsApp

What the system covers

  • Racking layout and zone map
  • Cooling units per zone
  • Ductwork from our workshop
  • Independent controls per zone
  • Airflow check after start-up
Request a quote

How we work

How we work

  1. 1

    Site survey

    We visit the warehouse, measure the internal height, review the racking layout and the positions of loading doors and offices, then map the main thermal zones before proposing any system.

  2. 2

    System design and zoning

    We design a system for each zone: central or split units for offices and critical stock areas, and evaporative or mechanical ventilation for the picking area where indoor humidity allows it.

  3. 3

    Duct fabrication and installation

    We fabricate round and rectangular ductwork in our workshop from G90 galvanised sheet to the site dimensions, insulate with Armaflex or Kimmco materials, then mount the units, run the copper and connect the control points.

  4. 4

    Start-up and handover

    We start each zone separately, measure airflow at multiple points across the warehouse floor, and check that all drain lines are clear before handing over.

A zoned system or unplanned scattered units?

AlrabihThe usual way
Zone designSurveyed and mapped before fittingUnits added when complaints come
DuctworkFabricated to site dimensionsFlex duct without calculation
Evaporative coolingWhere humidity allows itFitted without measuring humidity
Sensitive stockSeparate zone with its own controlLeft in the general air
Copper runsMueller, weld-free to 30 mMultiple welded joints

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Farouq's warehouses vary in size and use, from small spare-parts stores to large textile warehouses needing special humidity control. High humidity combined with intense summer heat can degrade goods quickly, so we focus on cooling systems that also manage humidity alongside temperature reduction.

Al Farouq sits in south Jeddah's mixed industrial and commercial zone, with a mix of small, medium and large warehouses alongside trading offices.

Most warehouses here use central or multi-split cooling units, with emphasis on humidity management to protect textiles and fabrics.

The AC setup in Al Farouq

  1. 1

    Multi-head split units

    Medium warehouses often use one outdoor unit connected to several indoor heads distributed around the building for efficient cooling spread.

  2. 2

    Light central system with flat ductwork

    Some smaller warehouses use a light central system with flat ductwork that fits lower ceilings.

  3. 3

    Powerful window units at main entrance

    We may add powerful window units at the main entrance to counter hot air leakage from worker and door traffic.

Before the visit

Before our visit in Al Farouq

  1. 1

    Describe warehouse use and product types

    Tell us what products are stored and whether they need specific low humidity, as this affects cooling system and humidity control choice.

  2. 2

    Show door and window locations

    Tell us where doors, windows and main entrances are, especially if there is constant worker traffic, to assess hot air leakage.

  3. 3

    Identify available space for outdoor units

    Confirm there is sheltered outdoor space away from rain and strong wind to safely install the outdoor units.

FAQ

Questions about Warehouse HVAC

Is evaporative cooling right for a warehouse in Jeddah?

It depends on indoor humidity levels and the type of stock stored. In well-ventilated open areas where stock is not sensitive to a small rise in humidity, evaporative cooling can work well. The site survey gives a clear answer before any decision is made.

How do you handle the height in tall warehouse bays?

In a tall bay, cool air settles low and hot air rises, which works in your favour when diffusers are aimed correctly at the working level and the racking. We set diffuser angles and positions during design based on the racking height and the movement aisles.

Can cold storage zones link to the rest of the warehouse system?

Cold rooms and freezer rooms run on their own refrigeration systems, which we install as a separate service. What we handle here is the ambient air around those room doors, so warm warehouse air does not rush in when they open, managed by pressure zoning between the two spaces.

Do warehouse air ducts need insulation?

Yes, especially ducts that run close to the hot metal roof. Without insulation, cool air gains heat before it reaches the diffusers and loses much of its effect. We insulate with Armaflex or Kimmco materials and seal joints with Foster sealants to stop air leaks.

Does airflow distribution differ between tall racking aisles and open floor areas?

Yes. In tall racking aisles the airflow path narrows and slows, so we choose directional diffusers that push air along the aisle length rather than spreading it sideways. In open floor areas we use wider-angle diffusers. The angle and position of each diffuser are set at design stage based on the aisle width and racking height.

My goods are humidity-sensitive, how does cooling protect the warehouse?

We select cooling units with strong dehumidifying capacity, and may add a separate humidity controller if the warehouse needs extra protection.

The warehouse is cramped with a low ceiling, does that affect the system choice?

Yes, tight space and low ceilings limit ductwork options, so we may use distributed split units or flat ductwork to fit the space.

Summer heat is extreme, how long does the cooling system take to cool effectively?

That depends on the warehouse size, target temperature, and insulation thickness in roof and walls. We assess it during the site visit.

The warehouse is open to workers all day with constant door traffic, does that hurt cooling efficiency?

Yes, each door opening lets hot air in. We select higher-capacity units and may recommend air curtains or a revolving door at the main entrance.

The Jeddah corniche in cool weather

Plan your warehouse cooling

Send us a floor plan or photos of the warehouse on WhatsApp and we will arrange a survey visit, Saturday to Thursday, eight in the morning to eight in the evening.

CallWhatsApp