Central AC, start to finish

Central AC installation in Al Sawari

In Al Sawari, north Jeddah, central AC installation for modern villas and apartment buildings needs precise coordination between load calculation, design and installation. Alrabih manages the whole project from design through to final commissioning, so you take over a working system without delays or disputes between contractors.

  • Design and build
  • Own-workshop ducts
  • Full commissioning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Who needs a complete central system?

  1. 1

    A new villa before finishing

    The finishing stage is the right time to run central AC ducts before the ceilings close. Delaying the decision means extra cost later or compromises in the duct route that weaken airflow in certain rooms.

  2. 2

    A commercial or office building

    A commercial building needs airflow that fits how the floors are divided and how the load varies between levels. The site survey sets unit count, duct routes and outlet positions before any decision is made.

  3. 3

    An old system draining power

    Old units, deteriorating ducts and leaking copper push the electricity bill up without cooling the space properly. Replacing the whole system starts with a fresh load calculation, not with larger units pushed into the same old ductwork.

Who it's for

  • Building a villa and need ducts before ceilings close

    We visit during the finishing stage, design duct routes and outlet positions, fabricate the ducts in our workshop and install them before the ceilings close, so you take over a fully working villa.

    Ask on WhatsApp
  • Managing a commercial building and replacing an old system

    We recalculate the loads, design airflow to match the current floor layout and replace both units and ductwork completely so the system runs reliably without repeated faults.

    Ask on WhatsApp

What the contract covers

  • Load calc and system design
  • Units from authorised distributors
  • Duct fabrication and fitting
  • Insulated Mueller copper runs
  • Full commissioning and handover
Request a quote

How we work

How we work

  1. 1

    Survey and load calculation

    The engineer visits, measures each zone, and calculates the thermal load per area, accounting for facade orientation, ceiling height and how the space will be used in Jeddah's hot and humid conditions.

  2. 2

    Design and unit selection

    We draw duct routes and outlet positions and select units from Carrier, YORK, General, Midea, Gree or Smart Gold, then present the design to you before any work begins.

  3. 3

    Fabrication and installation

    Round and rectangular ducts are fabricated in our workshop from G90 galvanised sheet to SMACNA standards, then installed on site alongside the copper runs, insulation and electrical connections.

  4. 4

    Commissioning and handover

    We pressure-test the copper lines, vacuum them, check air balance at every outlet and condensate drain fall, then hand the system over to you in full working order.

One contractor or several parties?

AlrabihThe usual way
Design and buildOne party accountableDesigner and installer split
DuctsOur workshop, G90 standardUnmonitored outside suppliers
CopperMueller up to 30 metres unweldedUnknown source, many joints
CommissioningPressure test, vacuum, air balanceStraight power-on, no testing
InsulationArmaflex and Kimmco fittedPatchy or missing

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Sawari is a relatively modern district with villas and residential blocks featuring regular architectural spaces and high ceilings, which eases duct and central run layout. The buildings here are designed with open floor plans and wide passages, so they need a balanced central system that delivers even airflow to every corner and room. Heat load calculations differ from other districts because of the architectural orientation and large windows, so accurate design before purchase delivers long-term efficiency and stable comfort.

Al Sawari lies in north Jeddah with modern buildings and villas of contemporary design and regular urban layout.

Most modern villas and apartment buildings in Al Sawari are designed to accommodate a unified central AC system with ducts in the ceiling or raised floors.

The AC setup in Al Sawari

  1. 1

    Central unified system with ceiling ducts

    Most modern Sawari villas accept ceiling ducts, which provides a clean look and even distribution throughout all rooms.

  2. 2

    Multi-branch airflow distribution for larger villas

    Larger villas may need separate branches for ground and upper floors, with individual zone dampers for separate control.

  3. 3

    Outdoor unit on ground or side canopy

    Most villas provide a quiet side yard or canopy, allowing the outdoor unit there away from the front facade.

Before the visit

Before our visit in Al Sawari

  1. 1

    Confirm outdoor unit location

    Agree with us on which yard corner or side will hold the outdoor unit, ensuring it is away from bedroom windows.

  2. 2

    Provide the villa or building blueprint

    If you have the villa or building blueprint before our visit, it speeds up heat load calculation and design accuracy.

  3. 3

    Prepare ceilings and passages for duct runs

    Ensure ceilings or raised spaces are clear of other pipes or wiring to ease central duct installation.

FAQ

Questions about Central AC installation

How do you decide the right unit size for my villa?

We calculate the thermal load for each zone based on its area, ceiling height, number of external openings, orientation and how it will be used. In Jeddah the sun's effect on west-facing facades is significant, and high humidity goes into the calculation. We choose the unit size after this calculation, not before.

Do you make the ducts yourselves or buy them ready-made?

We fabricate round and rectangular ducts in our own workshop from G90 galvanised sheet or aluminium sheet depending on what the project needs. This lets us cut ducts to the exact site dimensions and fit them tightly, avoiding ill-fitting sections that leak air and raise electricity consumption.

What if the copper run to an outdoor unit is very long?

We use Mueller copper in runs of up to 30 metres without welded joints, which reduces potential leak points. If a run exceeds that, the survey determines whether the outdoor unit position needs rethinking or whether the refrigerant charge needs adjustment according to the type shown on the unit's nameplate.

Can each floor of the villa run on its own?

Yes, and it is settled at the design stage. Each floor can have its own unit, or the network can be split into zones with dampers and a thermostat in each, so you do not cool the whole upper floor while the family sits in the majlis. We recommend the right option after the load calculation.

Do the outdoor units need a special base on the roof?

Yes, and the roof surface determines what kind of base is needed. For villas we fabricate a raised steel frame that keeps the unit clear of pooled rainwater and allows airflow beneath it. The exact height and angle depend on the roof pitch and the condensate drain position, which the site survey establishes. The aim is to keep the unit level and to prevent vibration movement during operation.

Modern villas here suit central AC, but how do you approach the initial design?

We measure spaces and usage patterns, calculate thermal load based on the building's orientation, windows and insulation, then draft a full design on specialist software before any unit or duct purchase.

Our architectural spaces are wide, do they need different ducts than in older buildings?

Yes, large open spaces and wide passages allow unified ducts with higher efficiency and better distribution, but we verify actual dimensions and runs before fabricating in our workshop.

Large windows and east-facing villas increase summer heat loads, how do you address this in design?

We factor orientation, glazing and insulation into the load calculation, so you might need a larger unit or concentrated airflow toward sun-exposed sides.

Copper runs to the outdoor unit, how do you determine the length and route?

We agree the outdoor unit location with you, choosing a sheltered corner and minimising distance from the roof or yard, then run copper through walls or raised ceilings with care to avoid sharp bends.

The Jeddah corniche in cool weather

Start with a site survey

WhatsApp a brief description of the villa or building and your district, or call us Saturday to Thursday between eight in the morning and eight in the evening to arrange a survey visit.

CallWhatsApp