Central AC, start to finish

Central AC installation in Al Tha'alibah

Central AC installation in Al Tha'alibah, south Jeddah, serves a mix of villas, apartment blocks and small commercial complexes. Alrabih calculates the load, designs the ducts, supplies the unit and copper, and handles full installation, so you take over a working system from day one without waiting for other contractors.

  • Design and build
  • Own-workshop ducts
  • Full commissioning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Who needs a complete central system?

  1. 1

    A new villa before finishing

    The finishing stage is the right time to run central AC ducts before the ceilings close. Delaying the decision means extra cost later or compromises in the duct route that weaken airflow in certain rooms.

  2. 2

    A commercial or office building

    A commercial building needs airflow that fits how the floors are divided and how the load varies between levels. The site survey sets unit count, duct routes and outlet positions before any decision is made.

  3. 3

    An old system draining power

    Old units, deteriorating ducts and leaking copper push the electricity bill up without cooling the space properly. Replacing the whole system starts with a fresh load calculation, not with larger units pushed into the same old ductwork.

Who it's for

  • Building a villa and need ducts before ceilings close

    We visit during the finishing stage, design duct routes and outlet positions, fabricate the ducts in our workshop and install them before the ceilings close, so you take over a fully working villa.

    Ask on WhatsApp
  • Managing a commercial building and replacing an old system

    We recalculate the loads, design airflow to match the current floor layout and replace both units and ductwork completely so the system runs reliably without repeated faults.

    Ask on WhatsApp

What the contract covers

  • Load calc and system design
  • Units from authorised distributors
  • Duct fabrication and fitting
  • Insulated Mueller copper runs
  • Full commissioning and handover
Request a quote

How we work

How we work

  1. 1

    Survey and load calculation

    The engineer visits, measures each zone, and calculates the thermal load per area, accounting for facade orientation, ceiling height and how the space will be used in Jeddah's hot and humid conditions.

  2. 2

    Design and unit selection

    We draw duct routes and outlet positions and select units from Carrier, YORK, General, Midea, Gree or Smart Gold, then present the design to you before any work begins.

  3. 3

    Fabrication and installation

    Round and rectangular ducts are fabricated in our workshop from G90 galvanised sheet to SMACNA standards, then installed on site alongside the copper runs, insulation and electrical connections.

  4. 4

    Commissioning and handover

    We pressure-test the copper lines, vacuum them, check air balance at every outlet and condensate drain fall, then hand the system over to you in full working order.

One contractor or several parties?

AlrabihThe usual way
Design and buildOne party accountableDesigner and installer split
DuctsOur workshop, G90 standardUnmonitored outside suppliers
CopperMueller up to 30 metres unweldedUnknown source, many joints
CommissioningPressure test, vacuum, air balanceStraight power-on, no testing
InsulationArmaflex and Kimmco fittedPatchy or missing

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Tha'alibah is a balanced residential and commercial neighbourhood in south Jeddah, mixing mid-rise apartment blocks with villas and small commercial buildings and shops, and streets here are wider than the old quarters but narrower than recently planned districts. This mix means each central AC project needs separate assessment based on building type, floor areas and height, and outdoor-unit placement may be tight because of limited rear yards or roof space.

Al Tha'alibah is in south Jeddah, a district of mid-rise apartment blocks mixed with villas and light commercial activity.

Most residential buildings in Al Tha'alibah stand four to six storeys high, and outdoor units usually go on roofs because rear yards are tight.

The AC setup in Al Tha'alibah

  1. 1

    Single outdoor unit on roof for whole building

    Smaller and mid-sized buildings in Al Tha'alibah often use a single roof-mounted outdoor unit with ducts descending to the floors.

  2. 2

    Two semi-central units, one per floor pair

    Some taller buildings or those with large flats use two outdoor units (one on roof, one mid-building) to split the load and improve air distribution.

  3. 3

    Vertical ducts in building columns

    Some buildings allow ducts to run vertically through existing columns or service shafts, saving false-ceiling space.

Before the visit

Before our visit in Al Tha'alibah

  1. 1

    Provide building plan with flat count and areas

    Send the floor plan or building layout showing flat count per floor and approximate area per unit, so we calculate the heat load accurately.

  2. 2

    Confirm safe roof access for technicians

    The roof must be safe and accessible. Check the access ladder and edge safety rail before our visit.

  3. 3

    Identify outdoor-unit location and confirm power

    Agree with the building manager on the outdoor-unit location and confirm that a strong electrical circuit runs nearby.

FAQ

Questions about Central AC installation

How do you decide the right unit size for my villa?

We calculate the thermal load for each zone based on its area, ceiling height, number of external openings, orientation and how it will be used. In Jeddah the sun's effect on west-facing facades is significant, and high humidity goes into the calculation. We choose the unit size after this calculation, not before.

Do you make the ducts yourselves or buy them ready-made?

We fabricate round and rectangular ducts in our own workshop from G90 galvanised sheet or aluminium sheet depending on what the project needs. This lets us cut ducts to the exact site dimensions and fit them tightly, avoiding ill-fitting sections that leak air and raise electricity consumption.

What if the copper run to an outdoor unit is very long?

We use Mueller copper in runs of up to 30 metres without welded joints, which reduces potential leak points. If a run exceeds that, the survey determines whether the outdoor unit position needs rethinking or whether the refrigerant charge needs adjustment according to the type shown on the unit's nameplate.

Can each floor of the villa run on its own?

Yes, and it is settled at the design stage. Each floor can have its own unit, or the network can be split into zones with dampers and a thermostat in each, so you do not cool the whole upper floor while the family sits in the majlis. We recommend the right option after the load calculation.

Do the outdoor units need a special base on the roof?

Yes, and the roof surface determines what kind of base is needed. For villas we fabricate a raised steel frame that keeps the unit clear of pooled rainwater and allows airflow beneath it. The exact height and angle depend on the roof pitch and the condensate drain position, which the site survey establishes. The aim is to keep the unit level and to prevent vibration movement during operation.

My building is six storeys, do I need one central unit or multiple units?

It depends on the flat count and total area. You might need one large unit or two semi-central units. We assess the building on-site and then present you with design options.

Building roofs here are tight and close to neighbours, how do you fit the outdoor unit?

Tight roofs need careful planning. We agree with the owner on the best spot that minimises noise and neighbour conflict, and may use an advanced mounting base that reduces vibration and sound.

The air humidity in south Jeddah is high, does that reduce central AC efficiency?

Yes, high humidity increases the system load. Our heat calculation factors in summer humidity levels in south Jeddah, and we select a unit with capacity to handle that condition.

Can ducts and wiring run through false ceilings in older flats?

Yes, but we first check the actual ceiling height and space between floor and false ceiling, since some older flats have tight plenums. We may need modifications or alternative solutions.

The Jeddah corniche in cool weather

Start with a site survey

WhatsApp a brief description of the villa or building and your district, or call us Saturday to Thursday between eight in the morning and eight in the evening to arrange a survey visit.

CallWhatsApp