Chiller and AHU installation
Chiller & AHU installation in Abhur Al Shamaliyah
In Abhur Al Shamaliyah, north Jeddah, chiller and AHU installation demands precision because large buildings cannot afford installation mistakes. Alrabih's team sets units on vibration-isolated bases, fully insulates the pipework, and runs a full commissioning test before handover.
- Vibration isolation
- Aluminium cladding
- Full commissioning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need this installation
- 1
A new commercial or government building
The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.
- 2
An existing unit vibrates and makes noise
Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.
- 3
Extending an existing building
Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.
Who it's for
Building a hospital or hotel that needs a central cooling plant
We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.
Ask on WhatsAppReplaced an old chiller but connections do not match
We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.
Ask on WhatsApp
What the installation covers
- Chiller lifted onto isolated base
- Chilled pipework run and insulated
- Aluminium cladding of pipework
- AHUs mounted and duct-connected
- Pressure test and commissioning
How we work
How we work
- 1
Site survey and design
We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.
- 2
Base preparation and lifting
We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.
- 3
Pipework and ductwork
We run the chilled water pipes, insulate them and clad them in aluminium sheet to resist Jeddah's humid salty air, then connect each AHU to its duct network.
- 4
Pressure test and commissioning
We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.
Considered installation or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Chiller base | Isolators matched to the site | Bolted straight to concrete |
| Pipe insulation | Full insulation with aluminium cladding | Partial or left bare |
| Pipe test | Pressure test before start-up | Started without testing |
| Air balancing | Measured and dampers adjusted | Unbalanced airflow |
| Transition pieces | Fabricated in our own workshop | Improvised or ill-fitting |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Abhur Al Shamaliyah holds large residential, hotel and administrative buildings with relatively wide outdoor spaces on rooftops and between wings. These buildings need centralised chiller and distributed AHU systems, and the wide roofs and corridors allow safe access for the team and heavy equipment. Full pipework insulation and vibration-isolated bases are essential here to protect suspended ceilings from moisture seepage.
Abhur Al Shamaliyah lies in modern north Jeddah, an area of large residential, hotel and administrative buildings.
Most large buildings here use a central chiller serving multiple AHU units distributed across the floors.
The AC setup in Abhur Al Shamaliyah
- 1
Central chiller on the building rooftop
Large buildings in Abhur Al Shamaliyah use a central rooftop chiller to serve multiple floors with high efficiency.
- 2
AHU units distributed across floors
Each floor or wing has an AHU unit connected to the central chiller's piping network.
- 3
Fully insulated piping networks
Chilled water pipes are fully insulated with foam and aluminium cladding to prevent moisture on suspended ceilings.
Before the visit
Before our visit in Abhur Al Shamaliyah
- 1
Confirm safe rooftop access for the team
Ensure the rooftop is safe for work and has enough space to unload equipment before the installation day.
- 2
Get building plans from management
Request building plans from management to determine exact positions for the chiller, AHUs and piping runs.
- 3
Map available spaces for pipes and penetrations
Identify the wall chases and ceiling spaces available for routing pipes and ducts without structural conflict.
More districts for Chiller & AHU installation
Other services in Abhur Al Shamaliyah
FAQ
Questions about Chiller & AHU installation
How is the chiller unit lifted to the roof?
The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.
Why do chilled water pipes need aluminium cladding in Jeddah?
Chilled water pipes carry cold water through hot, humid, salty air. Without external protection, insulation deteriorates from moisture and salt and loses effectiveness. Aluminium cladding protects the insulation from outdoor air on rooftops and the humid interior air found in coastal buildings like those in Jeddah.
Can you connect AHUs to an existing duct network?
Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.
What does system commissioning involve?
After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.
What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?
A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.
Do you install chillers in large hotel buildings here?
Yes, we install chillers and AHU units in large buildings in Abhur Al Shamaliyah, with full system testing before handover.
How do you bring heavy equipment to the roofs of large buildings?
The wide rooftops in Abhur Al Shamaliyah allow safe access, and we coordinate with building management to provide a loading area or dedicated stairway for equipment.
Our suspended ceilings are sensitive, how do you protect them from moisture?
We fully insulate the chilled water pipes with thick foam and cover them with aluminium cladding to prevent moisture seepage onto the suspended ceilings.
Will the chiller cause vibrations that damage the building structure?
We mount the chiller on vibration-isolated bases that prevent vibration transmission to the structure, protecting both the unit and the building.












































































