Chiller and AHU installation
Chiller & AHU installation in Al Harrah
In Al Harrah, north-east Jeddah, chiller and AHU installation for hospitals, malls and hotels demands precision because any mounting mistake affects the cooling of the entire building. Alrabih sets the chiller on vibration-isolated bases, fully insulates the chilled water pipework, connects each AHU to its duct network, and runs a full commissioning test before handover.
- Vibration isolation
- Aluminium cladding
- Full commissioning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need this installation
- 1
A new commercial or government building
The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.
- 2
An existing unit vibrates and makes noise
Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.
- 3
Extending an existing building
Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.
Who it's for
Building a hospital or hotel that needs a central cooling plant
We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.
Ask on WhatsAppReplaced an old chiller but connections do not match
We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.
Ask on WhatsApp
What the installation covers
- Chiller lifted onto isolated base
- Chilled pipework run and insulated
- Aluminium cladding of pipework
- AHUs mounted and duct-connected
- Pressure test and commissioning
How we work
How we work
- 1
Site survey and design
We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.
- 2
Base preparation and lifting
We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.
- 3
Pipework and ductwork
We run the chilled water pipes, insulate them and clad them in aluminium sheet to resist Jeddah's humid salty air, then connect each AHU to its duct network.
- 4
Pressure test and commissioning
We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.
Considered installation or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Chiller base | Isolators matched to the site | Bolted straight to concrete |
| Pipe insulation | Full insulation with aluminium cladding | Partial or left bare |
| Pipe test | Pressure test before start-up | Started without testing |
| Air balancing | Measured and dampers adjusted | Unbalanced airflow |
| Transition pieces | Fabricated in our own workshop | Improvised or ill-fitting |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Harrah is a fast-growing district with modern residential blocks and large commercial and service buildings, where hotels and hospitals need reliable centralised cooling systems covering multiple floors. The newer buildings have strong roofs and designated spaces for outdoor units, but details matter greatly, such as isolating vibration from the structure and draining condensation from the chilled water pipework into the drainage network, otherwise moisture leaks into the suspended ceilings below.
Al Harrah lies in north-east Jeddah and is marked by relatively modern buildings and large residential and commercial projects.
Most hospitals, malls and hotels in Al Harrah use centralised chiller systems with air-handling units distributed across the floors.
The AC setup in Al Harrah
- 1
Centralised chiller system with distributed piping
Large hospitals and malls in Al Harrah need one or more chillers serving the entire building via a network of insulated piping distributed across the floors.
- 2
Air-handling units on each floor or section
Each floor or section has an AHU connected to the duct and piping network to distribute cooled air to the rooms and corridors.
- 3
Unified condensation drainage
Drain pipes from each AHU connect to a centralised drainage network to prevent moisture accumulation in suspended ceilings and walls.
Before the visit
Before our visit in Al Harrah
- 1
Confirm the roof and internal spaces are ready
Check that the roof is strong and clear of obstructions, and that internal corridors and spaces for the AHUs are easily accessible.
- 2
Arrange the team's access to the roof and floors
If the building is in operation or admitting patients, coordinate with building management to ensure safe access for the team and equipment to the roof and designated interior spaces.
- 3
Verify power supply and drainage points
Confirm that strong power supply is available near the chiller location, and that drainage points for condensation are connected or ready before the visit.
More districts for Chiller & AHU installation
Other services in Al Harrah
FAQ
Questions about Chiller & AHU installation
How is the chiller unit lifted to the roof?
The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.
Why do chilled water pipes need aluminium cladding in Jeddah?
Chilled water pipes carry cold water through hot, humid, salty air. Without external protection, insulation deteriorates from moisture and salt and loses effectiveness. Aluminium cladding protects the insulation from outdoor air on rooftops and the humid interior air found in coastal buildings like those in Jeddah.
Can you connect AHUs to an existing duct network?
Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.
What does system commissioning involve?
After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.
What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?
A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.
How do you mount the chiller on the roof without vibration?
We mount the chiller on vibration-isolated bases that absorb vibration, so it does not transfer to the concrete structure and cause cracking or noise in the floors below.
The hotel has suspended ceilings, how do you prevent moisture leaks?
We fully insulate the chilled water pipework and clad it with aluminium, and connect the drain pan directly to the drainage network to stop condensation seeping onto the suspended ceilings.
The building is new and the main power is strong, but do we need an electrical check before installation?
Yes, we verify that the power supply and dedicated safety switches for the chiller and AHUs are adequate before installation begins.
The hospital needs operation immediately after installation, how do you test the system?
We run a full commissioning test before handover, including pressure checks on the chilled water, airflow balance from each AHU, and return temperature, to ensure the system is ready for immediate operation.












































































