Dedicated duct workshop
Duct fabrication in Al Atheer
Al Atheer in south Jeddah is home to modern villas and apartment blocks relying on distributed central AC systems. Workshop-fabricated duct arrives on site with precise dimensions and zero-loss joints, ready to hang.
- G90 sheet
- Site dimensions
- Complex fittings
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Who needs workshop-fabricated duct?
- 1
A contractor with project-specific sizes
Your project has non-standard sizes or volumes too large for site cutting. We fabricate rectangular and round sections from your drawings at exact dimensions, labelled and ready to hang when they reach the site.
- 2
Fittings too awkward to cut on site
Elbows, transitions, offsets and takeoffs come out distorted when cut by hand on site, leaking air and creating noise in the line. We make them in the workshop at the right dimensions with tight seams.
- 3
Extending or renovating an existing duct network
You need new branches, a damaged section replaced or a fitting that matches an old duct size. We measure the existing network on site and fabricate the pieces to match what is already there.
Who it's for
Building a facility that needs non-standard duct sizes
We read your project drawings and fabricate all sections and fittings at exact dimensions from G90 or aluminium sheet, labelled and ready to hang the moment they reach your site.
Ask on WhatsAppRenovating home AC and need fittings to match old duct
We measure the existing ductwork in your home and fabricate the branches, transitions and elbows needed to match the original duct without replacing the whole network.
Ask on WhatsApp
What the fabrication covers
- Site measure or drawings
- G90 or aluminium duct
- Elbows transitions and takeoffs
- Tight seams to SMACNA
- Labelled sections ready to hang
How we work
How we work
- 1
Take measurements
A technician visits the site or you send us the drawings; we list every duct section needed, its size and the correct sheet thickness for that section.
- 2
Fabricate sections and fittings
We cut, form and lock the sheet in the workshop, including all elbows, transitions, offsets and takeoffs, and each section comes out at its exact dimension.
- 3
Label and prepare for delivery
We number every section and fitting against the assembly plan so the installation crew knows exactly where each piece goes, with no guessing on site.
- 4
Deliver to site
We deliver the duct to your Jeddah site protected and ready to hang. If you need an installation crew, we can arrange that as a separate step.
Workshop fabrication or site cutting?
| Alrabih | The usual way | |
|---|---|---|
| Dimensional accuracy | Workshop machines, tight dims | Hand variation on site |
| Complex fittings | Correct elbows and transitions | Distorted, leaking air |
| Seam quality | Tight lock, low leakage | Gaps weaken pressure |
| Site schedule | Arrives ready to hang | Extra time and site noise |
| Salt and humidity | Aluminium where site demands | One sheet regardless |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Atheer's buildings are relatively newer and spread across larger plots, allowing for complex central AC systems with multiple takeoffs, bends and transitions. Workshop fabrication from galvanized or aluminium sheet lets us measure from site or drawings, so the duct arrives ready to hang with no air loss or efficiency drop.
Al Atheer lies in south Jeddah, a district of newer villas and apartment blocks spread across wider open plots than older areas.
Most villas and apartment blocks in Al Atheer use complex central duct systems rather than separate split units.
The AC setup in Al Atheer
- 1
Central distributed duct in modern villas
Most Al Atheer villas use a single duct run from a central fan with multiple branches feeding each room and living area.
- 2
Multi-unit systems in residential blocks
Al Atheer apartment blocks often need more than one duct system to serve multiple units, with complex transition pipes and offsets.
- 3
Aluminium or galvanized duct by site environment
We choose the material based on the duct's outdoor exposure and salt or humidity levels; galvanized sheet is stronger near coastal zones.
Before the visit
Before our visit in Al Atheer
- 1
Bring engineering drawings or a system sketch
Drawings help us calculate exact measurements and the number of branches and transitions needed before fabrication starts.
- 2
Confirm the outdoor unit location and duct path
Tell us where the outdoor unit will sit and the path the duct will take inside your villa or building before we visit.
- 3
Ensure access to ceilings or plenum spaces
Verify that your villa's ceilings or hidden plenum spaces are safe and accessible before we install the pipes and duct.
More districts for Duct fabrication
Other services in Al Atheer
FAQ
Questions about Duct fabrication
Can you fabricate from drawings without visiting the site?
Yes, when the drawings are clear and carry the actual as-built dimensions. If a dimension is uncertain or a field change has been made, we prefer a site visit to avoid a fabricated piece that does not fit. We discuss the better approach with you before starting work.
What is the difference between galvanized and aluminium sheet for duct?
G90 galvanized sheet is the standard choice for interior duct: strong and suited to a range of pressures. Aluminium is lighter and handles Jeddah's coastal humidity and salt air better, making it right for some exposed applications or where structural load is a limiting factor. The correct choice depends on the site.
Can you make elbows and transitions to match an existing duct network?
Yes. We measure the existing network on site to match sizes precisely, whether you need a new branch added, a damaged fitting replaced or an extension tied into the original ductwork. The right approach is confirmed after the site visit.
How do you choose sheet thickness for each section?
Thickness follows section size: a large duct needs heavier sheet to hold its shape under pressure, a small one can use lighter material. We apply the SMACNA requirements to each section in the project individually, not a single thickness across the whole job.
Does Jeddah's humidity and salt air affect which sheet material to use?
Yes, particularly for sections exposed to outdoor air or installed near fresh-air intakes. G90 galvanized sheet performs well inside the building, but aluminium is the better choice where duct is in continuous contact with Jeddah's humid, salt-laden air. The site survey determines the right material for each section.
Why can't the duct be cut on site instead of in the workshop?
On-site cutting cannot hold the precision needed for complex joints, whereas workshop fabrication ensures exact dimensions and zero air loss at every seam.
How do you measure the duct required for my central system?
We measure directly on site during design or use the building's engineering drawings, then fabricate each duct section to exact dimensions in the workshop.
Does fabricated duct last longer than duct cut on site?
Duct fabricated from quality galvanized or aluminium sheet lasts for many years, and tight joints maintain system efficiency without gradual leakage.
What is the difference between rectangular and round duct in a modern home system?
Rectangular duct fits tight spaces and wall cavities, while round duct suits main distribution lines. We choose the type based on your building's layout.












































































