Desert cooler, proper duct
Evaporative (desert) duct installation in Al Mahamid
In Al Mahamid, east Jeddah, evaporative duct installation suits dense commercial and residential buildings. Alrabih balances limited space with the need for effective air distribution across multiple floors.
- Sealed roof
- Galvanised duct
- Air changes
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need evaporative cooler duct
- 1
A large workshop or warehouse
Large industrial spaces get very hot in Jeddah summers and split units are expensive to run there. An evaporative cooler with distribution duct brings air to work areas at lower running cost, provided the space is ventilated and not sealed shut.
- 2
A majlis tent or seasonal space
Outdoor majlis areas and seasonal tents do not suit split AC units because of the structure. Evaporative duct delivers a cool air stream as long as the space is open enough for air changes, which the survey confirms.
- 3
Old duct with poor airflow
Old sheet duct cracks over time and air leaks from the joints before reaching the space. On site we check whether the problem is leaking duct, poor distribution, or the cooler size itself.
Who it's for
Need to cool a large workshop at reasonable running cost
We survey the workshop and check its ventilation, then run galvanised duct from the roof cooler to the work areas with exhaust openings that keep air moving through the space.
Ask on WhatsAppYou have an outdoor majlis that needs seasonal cooling
We check how open the majlis is and assess its structure, then design the duct route and exhaust openings so cool air reaches the seating area without humid air building up inside.
Ask on WhatsApp
What the work covers
- Weatherproof roof collar fitted
- G90 galvanised duct runs
- Branch and air outlet connections
- Exhaust openings for air changes
- Airflow check after start-up
How we work
How we work
- 1
Site survey first
We visit, measure the space and check how open it is, because evaporative cooling needs enough ventilation; without it humidity rises inside and the cooling effect drops.
- 2
Plan the duct route
We plan the main duct run, branches, air outlet positions and exhaust opening locations, and show you the layout before any work starts.
- 3
Install duct and seal roof
We open the roof, fit and seal the collar against leaks, then run the galvanised duct and hang it on proper supports so it does not sag.
- 4
Start-up and test
We run the evaporative cooler and check that air reaches every outlet and that the exhaust openings are working so fresh air is visibly moving through the space.
Planned duct or a quick run?
| Alrabih | The usual way | |
|---|---|---|
| Roof seal | Weatherproof, sealed collar | Silicone that cracks in heat |
| Sheet | G90 galvanised | Unspecified gauge |
| Exhaust | Sized openings for air changes | Left to chance |
| Space suitability | Confirmed by survey | Not checked |
| Duct supports | Fixed hangers along the full run | Duct left unsupported |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Mahamid is densely built with closely spaced residential and commercial blocks and limited roof space, requiring careful planning of cooler and duct placement. Tight roof space means the cooler and duct must be fitted efficiently without waste, and distribution across multiple floors needs strong air pressure and wise duct splitting. The dry eastern heat provides good evaporative cooling conditions, but dense building and close proximity may raise ambient temperature.
Al Mahamid lies in east Jeddah, a densely built area of closely spaced residential and commercial blocks.
Most Al Mahamid buildings are multi-storey blocks with limited roofs, making duct planning and air distribution more complex than single villas.
The AC setup in Al Mahamid
- 1
Single cooler with duct split for multiple floors
One unit on the tight roof distributes cool air via split duct with dampers controlling flow to each floor.
- 2
Exhaust openings distributed in tight gaps
Exhaust openings are placed in available gaps between close buildings for safe, effective discharge.
- 3
Robust sealant against dust and heat
The roof opening is sealed robustly against dust and the intense heat from dense building.
Before the visit
Before our visit in Al Mahamid
- 1
Confirm access to shared or building roof
If the roof is shared, coordinate with building management to ease team access and obtain clearances.
- 2
Measure available roof space
A simple sketch of roof dimensions and gaps helps the team pinpoint the cooler location precisely.
- 3
Coordinate with building management and residents
Inform management and residents of the fitting and testing schedule to avoid disruption.
More districts for Evaporative (desert) duct installation
Other services in Al Mahamid
FAQ
Questions about Evaporative (desert) duct installation
Does evaporative cooling work in Jeddah in summer?
Evaporative cooling relies on water evaporation and weakens when humidity is high. In Jeddah, humidity is higher near the coast and lower inland. The survey decides whether the space and the season are suitable, which is why we do not start before visiting the site.
Why do exhaust openings matter as much as the duct runs?
An evaporative cooler pushes fresh air in continuously. Without an exit path, humid air builds up inside and the felt temperature rises. Properly sized exhaust openings keep air moving through, not piling up, and that is the core of how this type of cooling works.
What sheet do you use for the duct?
We use G90 galvanised steel sheet, which resists rust in Jeddah's humid and salty air. The duct sections are formed in our workshop before being taken to site, then hung on supports along the run to stop them sagging.
Can one cooler supply duct to more than one area?
Duct can be branched from one unit to more than one outlet, but each branch reduces the airflow at every opening. The survey decides whether the cooler has enough output for the total area, or whether a separate unit for each wing is the better answer.
Can evaporative cooler duct run through a false ceiling?
Evaporative cooling depends on continuous air movement and exchange, which requires exhaust openings in the same space the duct serves. A false ceiling restricts that flow unless dedicated openings lead air out of the building. The site survey decides whether the structure allows it, because the duct run and the exhaust are designed together as one system, not separately.
Al Mahamid's roofs are tight, is there enough space for the cooler?
Roofs are limited but usually accommodate one unit. Our team's survey assesses available space and determines feasibility.
How do you distribute air evenly across multiple floors?
The team splits the duct wisely and uses air dampers to ensure even distribution on each floor.
Does Al Mahamid's dense building affect evaporative cooling efficiency?
Dense building may raise ambient heat, but dry eastern air provides good conditions. The team measures heat and humidity during the survey.
With closely spaced buildings, where do you place exhaust openings?
We site openings based on available gaps between buildings and safe directions for warm air discharge.












































































