Cooling fit for a mosque

Mosque HVAC in Al Murjan

In Al Murjan, north Jeddah, modern mosques face intense heat and high humidity from proximity to the sea and valleys. Alrabih designs powerful, reliable cooling systems that distribute cold air evenly and maintain the quiet needed for worship.

  • Even distribution
  • Quiet units
  • Scheduled servicing

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When a mosque needs a specialist approach

  1. 1

    Heat reaching the back rows

    Cold air pools near the units and never reaches the back of the hall. In Jeddah's humidity, worshippers in the far rows feel the heat even with the system running. That is a design problem, not a unit fault.

  2. 2

    Noise that disturbs prayer

    Unit noise in a quiet hall distracts worshippers and breaks concentration. The right unit type, its position and the air velocity setting all reduce noise to the lowest possible level, and those choices are made at the survey.

  3. 3

    A dome or high ceiling that traps heat

    Hot air rises and collects under the dome, so the breathing level stays warm even with large units running. We set diffuser angles and air paths at the survey to push that hot layer out rather than cool over the top of it.

Who it's for

  • Building a new mosque that needs AC from the start

    We join the design stage to fix duct routes and unit positions before ceilings are closed, so the installation is clean and efficient with no remedial work needed later.

    Ask on WhatsApp
  • Your existing mosque cools unevenly across the rows

    We survey the existing system, find the cause of uneven distribution and propose changes to the airflow paths or units without disrupting the mosque.

    Ask on WhatsApp

What the work covers

  • Hall survey and airflow mapping
  • Ductwork to SMACNA standard
  • Units fitted at surveyed positions
  • Airflow check across the rows
  • Contracts scheduled between prayers
Request a quote

How we work

How we work

  1. 1

    Mosque survey

    We visit the mosque outside prayer times to measure the hall, ceiling height and dome, and agree diffuser positions, duct routes and unit locations before any work begins.

  2. 2

    Design and fabrication

    We design the system from the survey data and fabricate the ducts in our own workshop from G90 galvanised sheet, then prepare them for installation.

  3. 3

    Installation at agreed times

    We coordinate with mosque management to work between prayers or at times that do not interrupt activities, and we leave the hall clean at the end of each working day.

  4. 4

    Testing and handover

    We run the system and measure air distribution at the front and back rows and sound levels, adjusting the balance until comfort is even across the whole hall.

Designed for a mosque or units placed at random?

AlrabihThe usual way
Air distributionEven across every rowCold front, hot back
SoundAssessed at surveyNot considered
Dome and high ceilingPlanned airflow pathsHot layer left above
MaintenanceScheduled between prayersVisits that disrupt use
Startup schedulingProgrammed before each prayerManual, inconsistent start

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Murjan is a relatively modern district in north Jeddah with contemporary mosques in varied designs, set near the coast with surrounding valleys that drive heat and humidity high. Cooling systems here need strong capacity to handle the heavy summer load, and design that distributes air evenly across wide prayer halls and domes.

Al Murjan sits in north Jeddah near the coast and valleys, a modern district with contemporary mosques in varied architectural styles.

Contemporary mosques in Al Murjan use high-capacity central cooling systems due to the heavy thermal load from the geography and high humidity.

The AC setup in Al Murjan

  1. 1

    Central system with high capacity for heavy load

    Al Murjan's geography and high humidity call for a central system with large capacity and effective drainage.

  2. 2

    Supplementary dehumidifier for moisture control

    We integrate a supplementary dehumidifier to combat coastal humidity and mould in Al Murjan's damp climate.

  3. 3

    Outdoor unit in salt and mould-resistant materials

    The outdoor unit is made from salt and mould-resistant materials given Al Murjan's closeness to the coast and high moisture.

Before the visit

Before our visit in Al Murjan

  1. 1

    Bring prayer hall, dome and divider plans

    We need comprehensive plans showing prayer hall sections, dome, dividing walls and entrances to map control zones.

  2. 2

    Confirm suitable roof and outdoor location

    Identify the roof or outdoor space for the main unit and ensure safe access and adequate ventilation around it.

  3. 3

    Coordinate with imam and administrative team

    Tell the imam and administrative team about visit and installation dates to avoid clashing with mosque activities.

FAQ

Questions about Mosque HVAC

How do you make sure the far rows get enough cooling?

At the survey we set diffuser angles, air velocity and duct routing so cold air travels to the last row. After installation we measure the temperature difference between the front and back rows and adjust each diffuser's balance until that difference is as small as the space allows.

Can you work in a functioning mosque without disrupting prayers?

Yes. We agree a phased schedule with mosque management in advance and divide the work into sessions between prayers. Before each call to prayer we lift tools, cover any temporary openings and return the hall to a usable state, then resume afterwards.

What type of ductwork do you use in prayer halls?

We fabricate ducts in our own workshop from G90 galvanised sheet, round or rectangular as the design requires. We use Armaflex and Kimmco insulation and Foster sealants to limit heat gain and keep sound transmission through the ductwork as low as possible.

Can the system be set to start just before each prayer time?

Yes. The controls on Carrier, YORK, General, Midea, Gree and Smart Gold units support scheduled start and stop times. At the survey we confirm the scheduling options for the chosen units and programme the timings at handover, so the hall is already cool when worshippers arrive.

Can we cool only part of the hall when fewer people attend?

Yes, if the system is designed in zones. We divide the hall into sections, each with its own unit or closable outlets, so you run the front rows alone when few people attend and the whole hall for Friday prayer and occasions, cutting power use without affecting worshippers.

Heat is intense here in summer, can your system handle the heavy load?

We specify outdoor units with high capacity suited to Al Murjan's thermal load, and design ducts and outlets to distribute cooling efficiently across the entire hall.

High humidity causes mould quickly, how do you solve this?

We integrate a supplementary dehumidifier in the system to lower moisture, and fit coils with effective drainage to prevent moisture buildup.

Can you split cooling across different zones in the mosque?

Yes, we design a central system with separate zones and independent controls for each prayer hall section based on cooling needs.

How do you ensure no leaks in the ducts under ceilings?

We use high-quality insulated ducts and test them carefully before startup, then inspect them regularly after installation to prevent leaks.

The Jeddah corniche in cool weather

Prepare your mosque for comfortable prayer

Send us a photo of the hall or dome on WhatsApp or call us, and we will arrange a survey at a time that suits the mosque, Saturday to Thursday.

CallWhatsApp