Fitted right first time
Split AC installation in Al Faisaliyah
In Al Faisaliyah, central Jeddah's mixed residential and commercial towers demand careful split installation because the varied building heights create challenges for copper runs and drainage. Alrabih places both units with precision, vacuums the line before start-up, and ensures quiet cooling without wall drips from day one.
- Mueller copper
- Full vacuum
- Proper drain
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need a proper installer
- 1
A new unit for a room or flat
You have bought the unit, or are about to, and want it fitted once, not to find a refrigerant leak or water on the floor a few weeks later. Getting it right first time saves you all of that.
- 2
Not sure where the outdoor unit goes
In Jeddah flats the choice is usually the roof, the balcony or the facade. We pick a spot where the condenser gets enough air, a technician can reach it for servicing, and neither noise nor drain water bothers the neighbours.
- 3
A past install that went wrong
Weak cooling since day one, water running down the wall, a loud indoor unit. These are usually installation mistakes, not faults in the unit, and our installation is built step by step to avoid them.
Who it's for
Moving into a new flat that needs AC
We plan every unit position and copper route in one go, so the whole flat ends up neat and consistent.
Ask on WhatsAppFitting AC in a shop or office
We place the units so cool air reaches the entrance and the work area, and arrange outdoor units and drains to suit the shopfront and the building's rules.
Ask on WhatsApp
What the installation covers
- Site check and unit positions
- Insulated copper, sealed wall core
- Drain line with correct fall
- Vacuum and leak test
- Start-up test with you present
How we work
How we work
- 1
Send a photo
WhatsApp us a photo of the room, where the outdoor unit might go and your district, and we tell you what the job needs before the visit.
- 2
Agree positions and route
On site, the technician agrees the unit positions and the copper and drain route with you before drilling any wall.
- 3
Fit and vacuum
We mount both units, run and insulate the copper, then vacuum the line with a pump and check the joints before releasing the refrigerant held in the outdoor unit.
- 4
Start-up and handover
We run the unit, measure the air coming out, check the drain flows, then leave the room clean and show you the remote and how to clean the filter.
A careful install or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Vacuum | Pumped before start-up | Often skipped |
| Copper | Mueller, fully insulated | Patchy insulation |
| Drain | Falls, so no drips | Water down the wall |
| Outdoor unit spot | Airy and easy to reach | Wherever it fits |
| Wall opening | Sealed tight | Dust gets through |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Faisaliyah mixes modern residential towers, multi-storey commercial buildings and older villas, with building heights varying widely and affecting copper run lengths and the distance between indoor and outdoor units. In tall buildings, precise planning is needed to mount the outdoor unit on the roof or deep balcony, ensuring correct drainage slope over long runs. Coordination with building management and maintenance is vital to avoid clashing with existing electrical circuits and water pipes.
Al Faisaliyah sits in central Jeddah, blending modern residential towers, mixed-height commercial buildings and scattered older villas.
In the residential towers here, outdoor units are typically mounted on roofs or deep balconies, with copper runs sometimes reaching 15 metres or more.
The AC setup in Al Faisaliyah
- 1
Split systems in tall residential flats
Most flats in Al Faisaliyah's towers need a split with a long copper run from the flat to an outdoor unit on the roof or deep balcony.
- 2
Splits in offices and retail shops
The mixed-height commercial buildings need planning to place outdoor units on shared roofs in coordination with building management.
- 3
Splits in scattered older villas
The older scattered villas in Al Faisaliyah usually need an outdoor unit on an external wall or yard, with good insulation to handle intense summer heat.
Before the visit
Before our visit in Al Faisaliyah
- 1
Notify building management of the visit
If installing in a tower or residential building, notify building management at least two days ahead to smooth access to roofs or balconies.
- 2
Confirm the outdoor unit location in advance
Confirm where the outdoor unit will go (roof, deep balcony, external wall), and check that the location is safe, away from direct heat sources and dust.
- 3
Measure the distance between units
If the distance between indoor and outdoor units exceeds 10 metres, tell us before the visit so we can prepare a sufficiently long insulated copper run.
More districts for Split AC installation
Other services in Al Faisaliyah
FAQ
Questions about Split AC installation
Will you install a unit I bought elsewhere?
Yes, we install units you have bought yourself. Before the visit we ask the model, its capacity and where both units will go, so we know the copper length. If you have not bought one yet, we are an authorised distributor for Carrier, YORK, General, Midea, Gree and Smart Gold and can help you choose.
Why does the line need vacuuming before start-up?
New pipes hold air and moisture, and Jeddah's humid air adds more. Mixed with refrigerant, they weaken cooling and strain the compressor over time. We pull them out with a vacuum pump, watch that the reading holds so we know the line is tight, and only then release the refrigerant.
Can the outdoor unit be far from the room?
Yes, within the manufacturer's limits for line length and height difference. We use Mueller copper in runs of up to 30 metres without welded joints, so there are fewer joints that could leak, and the survey shows whether a long run needs extra refrigerant.
Can you hide the copper and cables in the wall?
It depends on the house. In a new build or during finishing works, the copper can run inside the wall before plastering. In a lived-in home we use neat plastic trunking in the wall colour. We show you the better option for your home at the survey, before any work starts.
What if the outside wall cannot carry the unit?
We check the wall before fixing anything, because some facades are clad in stone or panels that cannot take the weight. Then we set the unit on a floor stand on the roof or balcony, or on a bracket anchored to the concrete itself, not the cladding, so it does not shake loose.
Installing a split in a tall tower: does a long copper run affect cooling?
Longer copper runs need extra care with pipe insulation and professional vacuuming to prevent pressure loss and deliver full cooling. We follow strict standards for every length.
How do you coordinate with building management and maintenance before installation?
We ask the client to notify building management of the visit date, and we confirm with the maintenance team the routes of existing electrical and water lines before any drilling or fixing.
Heat, humidity and dust in central Jeddah: does this affect where we place the outdoor unit?
Yes, the outdoor unit in towers must be placed away from heat reflected by sun-facing walls, and in a location that allows good airflow to reduce compressor stress during Jeddah's hot summers.
Power cuts occasionally happen in towers: does this affect a new unit?
The unit itself tolerates power cuts, but we ensure the electrical connection runs through a proper isolated breaker, and we advise checking the wiring before summer.












































































