Fitted right first time
Split AC installation in Al Mustaqbal
In Al Mustaqbal, south Jeddah, split AC installation in new villas and modern apartment blocks benefits from contemporary design and adequate space. Alrabih's team positions units with high precision, full insulation of copper pipes, and ideal line evacuation, ensuring cool, quiet performance from day one.
- Mueller copper
- Full vacuum
- Proper drain
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need a proper installer
- 1
A new unit for a room or flat
You have bought the unit, or are about to, and want it fitted once, not to find a refrigerant leak or water on the floor a few weeks later. Getting it right first time saves you all of that.
- 2
Not sure where the outdoor unit goes
In Jeddah flats the choice is usually the roof, the balcony or the facade. We pick a spot where the condenser gets enough air, a technician can reach it for servicing, and neither noise nor drain water bothers the neighbours.
- 3
A past install that went wrong
Weak cooling since day one, water running down the wall, a loud indoor unit. These are usually installation mistakes, not faults in the unit, and our installation is built step by step to avoid them.
Who it's for
Moving into a new flat that needs AC
We plan every unit position and copper route in one go, so the whole flat ends up neat and consistent.
Ask on WhatsAppFitting AC in a shop or office
We place the units so cool air reaches the entrance and the work area, and arrange outdoor units and drains to suit the shopfront and the building's rules.
Ask on WhatsApp
What the installation covers
- Site check and unit positions
- Insulated copper, sealed wall core
- Drain line with correct fall
- Vacuum and leak test
- Start-up test with you present
How we work
How we work
- 1
Send a photo
WhatsApp us a photo of the room, where the outdoor unit might go and your district, and we tell you what the job needs before the visit.
- 2
Agree positions and route
On site, the technician agrees the unit positions and the copper and drain route with you before drilling any wall.
- 3
Fit and vacuum
We mount both units, run and insulate the copper, then vacuum the line with a pump and check the joints before releasing the refrigerant held in the outdoor unit.
- 4
Start-up and handover
We run the unit, measure the air coming out, check the drain flows, then leave the room clean and show you the remote and how to clean the filter.
A careful install or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Vacuum | Pumped before start-up | Often skipped |
| Copper | Mueller, fully insulated | Patchy insulation |
| Drain | Falls, so no drips | Water down the wall |
| Outdoor unit spot | Airy and easy to reach | Wherever it fits |
| Wall opening | Sealed tight | Dust gets through |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Mustaqbal is a modern, developing district south of Jeddah with new villas and apartment blocks on wide open plots, built to high contemporary standards with safe roofs, clear exterior walls and adequate space. Installation is relatively straightforward but requires understanding of modern architectural designs, especially concealed central ventilation and electrical conduits hidden in walls, and coordination with contractors during build stages if installation is part of a new project.
Al Mustaqbal lies south of Jeddah, a modern developing area of new villas and residential blocks on wide plots.
Most new villas and blocks in Al Mustaqbal have safe roofs and strong exterior walls, offering multiple flexible placement options for outdoor units.
The AC setup in Al Mustaqbal
- 1
Modern split units on safe, open rooftops
New villas and blocks in Al Mustaqbal offer safe, spacious roofing with ample natural ventilation space for outdoor units.
- 2
Insulated pipes in contemporary walls
Contemporary construction allows safe concealment of pipes inside insulated walls, improving appearance and reducing cooling loss.
- 3
Modern roofs with regular drainage systems
Modern roofs have improved drainage systems, making it easy to direct condensate safely and efficiently.
Before the visit
Before our visit in Al Mustaqbal
- 1
Send the floor plans in advance
Send photos of your plans showing rooms, roofing and distances so we can prepare measurements and pipe runs beforehand.
- 2
Confirm electrical and plumbing works are complete
If the villa is under construction, confirm the contractor has finished all electrical and other plumbing before the installation date.
- 3
Designate the room and wall for the indoor unit
Choose your preferred room and wall for the indoor unit (master bedroom, living room) and note any electrical outlets nearby.
More districts for Split AC installation
Other services in Al Mustaqbal
FAQ
Questions about Split AC installation
Will you install a unit I bought elsewhere?
Yes, we install units you have bought yourself. Before the visit we ask the model, its capacity and where both units will go, so we know the copper length. If you have not bought one yet, we are an authorised distributor for Carrier, YORK, General, Midea, Gree and Smart Gold and can help you choose.
Why does the line need vacuuming before start-up?
New pipes hold air and moisture, and Jeddah's humid air adds more. Mixed with refrigerant, they weaken cooling and strain the compressor over time. We pull them out with a vacuum pump, watch that the reading holds so we know the line is tight, and only then release the refrigerant.
Can the outdoor unit be far from the room?
Yes, within the manufacturer's limits for line length and height difference. We use Mueller copper in runs of up to 30 metres without welded joints, so there are fewer joints that could leak, and the survey shows whether a long run needs extra refrigerant.
Can you hide the copper and cables in the wall?
It depends on the house. In a new build or during finishing works, the copper can run inside the wall before plastering. In a lived-in home we use neat plastic trunking in the wall colour. We show you the better option for your home at the survey, before any work starts.
What if the outside wall cannot carry the unit?
We check the wall before fixing anything, because some facades are clad in stone or panels that cannot take the weight. Then we set the unit on a floor stand on the roof or balcony, or on a bracket anchored to the concrete itself, not the cladding, so it does not shake loose.
My villa is newly built, can you install the split before we move in?
Yes, we install units in new homes before move-in, but we coordinate with the contractor first to confirm electrical wiring and other services are fully complete.
Should the copper pipes and wiring be hidden inside the walls?
Pipes and wiring can be concealed in new construction walls if you request it, but this requires prior planning with the contractor. We usually prefer exposed runs for easier maintenance.
Al Mustaqbal is inland, is the heat different from coastal areas?
Yes, inland areas south of Jeddah have lower humidity but may experience higher summer temperatures. We select units with cooling capacity suited to intense, dry heat.
I have architectural plans for my villa, what do you need before the visit?
Send us a photo of the floor plan showing room locations and the roof access, so we can estimate the distance between indoor and outdoor units and pre-prepare pipe measurements.












































































