Warehouse Cooling
Warehouse HVAC in Al Amwaj
In Al Amwaj, northern Jeddah, modern warehouses with metal roofs need distributed cooling that matches the stock volume and workforce size. Alrabih designs a multi-zone AC system to protect goods and workers from the intense daytime heat.
- Zone control
- Stock protection
- Directed ventilation
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When your warehouse needs a proper HVAC system
- 1
Heat that damages stored stock
Food, pharmaceutical and electronics stock all have storage temperature limits. When a metal warehouse roof bakes under Jeddah's sun, the air inside becomes a direct threat to shelf life and product quality. The solution starts with a survey of the racking layout to find the critical zones.
- 2
Workers overheating in the picking area
Workers in the picking and loading area move constantly under a hot roof. Natural ventilation alone is not enough in summer. We choose between direct cooling and evaporative cooling based on a site survey and the indoor humidity level.
- 3
Warehouse offices that are never comfortable
Supervisor and reception offices have different needs from the large storage hall. Putting them on one system raises cost and weakens performance in both areas. We give the office zone its own system and link it to the warehouse with pressure-control points.
Who it's for
Storing heat-sensitive stock in a warehouse
We locate the critical zone in the racking layout and design an independent cooling system with its own controls, keeping that area at a safe temperature separate from the rest of the warehouse.
Ask on WhatsAppBuilding a new warehouse and need HVAC from the start
We join the project at design stage before the roof closes, mapping cooling zones, ventilation and duct routes to fit the racking plan and loading doors from the outset.
Ask on WhatsApp
What the system covers
- Racking layout and zone map
- Cooling units per zone
- Ductwork from our workshop
- Independent controls per zone
- Airflow check after start-up
How we work
How we work
- 1
Site survey
We visit the warehouse, measure the internal height, review the racking layout and the positions of loading doors and offices, then map the main thermal zones before proposing any system.
- 2
System design and zoning
We design a system for each zone: central or split units for offices and critical stock areas, and evaporative or mechanical ventilation for the picking area where indoor humidity allows it.
- 3
Duct fabrication and installation
We fabricate round and rectangular ductwork in our workshop from G90 galvanised sheet to the site dimensions, insulate with Armaflex or Kimmco materials, then mount the units, run the copper and connect the control points.
- 4
Start-up and handover
We start each zone separately, measure airflow at multiple points across the warehouse floor, and check that all drain lines are clear before handing over.
A zoned system or unplanned scattered units?
| Alrabih | The usual way | |
|---|---|---|
| Zone design | Surveyed and mapped before fitting | Units added when complaints come |
| Ductwork | Fabricated to site dimensions | Flex duct without calculation |
| Evaporative cooling | Where humidity allows it | Fitted without measuring humidity |
| Sensitive stock | Separate zone with its own control | Left in the general air |
| Copper runs | Mueller, weld-free to 30 m | Multiple welded joints |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Most Al Amwaj warehouses are modern with high metal roofs and large open spans, so heat absorption is very rapid during morning and midday hours. The warehouse's spatial layout calls for a multi-zone cooling system rather than a single unit, because temperatures vary between storage areas, work zones and offices. Extra insulation or efficient air circulation systems keep temperatures stable across each zone.
Al Amwaj is in northern Jeddah, a modern area housing industrial and commercial warehouses with high metal roofs.
Distributed cooling systems here typically combine multiple outdoor units with ducted air distribution to cover the large open spans.
The AC setup in Al Amwaj
- 1
Distributed system with multiple outdoor units
The large, open spans in Al Amwaj warehouses require multiple outdoor units linked to a single control system to ensure even cool distribution.
- 2
Air ducts running above the high spans
Ducts run high beneath the metal roof to avoid obstructions on the floor and allow for future warehouse expansion.
- 3
Separate cooling zones by use type
Storage area, work floor and offices each need different temperature settings, and we coordinate them through a single central control system.
Before the visit
Before our visit in Al Amwaj
- 1
Confirm site access is possible
Al Amwaj warehouses often need entry permission or advance coordination with security, so tell us the access requirements before we visit.
- 2
Identify space dimensions and roof heights
Measure the roof height and the length of the open spans so we can calculate system capacity and ducting precisely.
- 3
Confirm outdoor unit locations
Identifying outdoor unit locations on the ground or roof in advance speeds design and avoids clashes with warehouse operations.
More districts for Warehouse HVAC
Other services in Al Amwaj
FAQ
Questions about Warehouse HVAC
Is evaporative cooling right for a warehouse in Jeddah?
It depends on indoor humidity levels and the type of stock stored. In well-ventilated open areas where stock is not sensitive to a small rise in humidity, evaporative cooling can work well. The site survey gives a clear answer before any decision is made.
How do you handle the height in tall warehouse bays?
In a tall bay, cool air settles low and hot air rises, which works in your favour when diffusers are aimed correctly at the working level and the racking. We set diffuser angles and positions during design based on the racking height and the movement aisles.
Can cold storage zones link to the rest of the warehouse system?
Cold rooms and freezer rooms run on their own refrigeration systems, which we install as a separate service. What we handle here is the ambient air around those room doors, so warm warehouse air does not rush in when they open, managed by pressure zoning between the two spaces.
Do warehouse air ducts need insulation?
Yes, especially ducts that run close to the hot metal roof. Without insulation, cool air gains heat before it reaches the diffusers and loses much of its effect. We insulate with Armaflex or Kimmco materials and seal joints with Foster sealants to stop air leaks.
Does airflow distribution differ between tall racking aisles and open floor areas?
Yes. In tall racking aisles the airflow path narrows and slows, so we choose directional diffusers that push air along the aisle length rather than spreading it sideways. In open floor areas we use wider-angle diffusers. The angle and position of each diffuser are set at design stage based on the aisle width and racking height.
How do I efficiently cool a warehouse with a high metal roof?
Dividing the warehouse into separate cooling zones reduces heat loss and concentrates cooling where it is actually needed. Our team assesses the space volumes and use patterns for each zone and selects the right capacity.
The warehouse is set back from the main road, is maintenance difficult?
Yes, Al Amwaj warehouses often require internal access roads, but we plan the approach routes to outdoor units and distribution boxes in advance to ease regular maintenance.
The sun beats on the metal roof all day, does that hit power consumption?
Yes, an exposed metal roof raises the cooling load significantly, so we recommend studying thermal insulation or reflective coating to reduce the strain on the system.
Does warehouse AC need heavy-duty electrical connections?
Yes, a distributed cooling system with multiple units needs separate electrical distribution for each unit, and we check the warehouse's power supply capacity before design.












































































