Medical facility HVAC

Hospital HVAC in Al Sawari

In Al Sawari, north Jeddah, hospital and large clinic cooling systems need careful design for each medical department. Alrabih designs the system from each department's requirements and the building survey, and carries out maintenance without stopping patient care.

  • Per-department ventilation
  • Maintenance without shutdown
  • Survey-based design

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When you need a medical HVAC specialist

  1. 1

    Hospital or clinic under construction

    The right design starts before any duct is installed, because ventilation and filtration needs differ from the surgical suite to the waiting area. An early survey saves costly alterations after the building is finished.

  2. 2

    Departments reporting warm air or odours

    In an existing medical building, weak cooling in one department or odours crossing into an adjacent area signals an imbalance in the air distribution or extraction system. Finding the cause needs measurement, not guesswork.

  3. 3

    Maintenance contract for a running facility

    A hospital does not close for equipment servicing. We schedule preventive maintenance visits department by department, coordinated with facility management, and carry out repairs with the smallest possible effect on daily operations.

Who it's for

  • Building a new hospital or medical centre

    We survey the building early and design systems to each department's requirements before installation begins.

    Ask on WhatsApp
  • Your clinic has repeated cooling faults

    We inspect the existing systems, find the root cause of recurring faults, and repair them without stopping the clinic.

    Ask on WhatsApp

What the service covers

  • Building survey and requirements
  • Duct network and AHU design
  • Installation commissioning and testing
  • Preventive and corrective contracts
  • Maintenance without stopping departments
Request a quote

How we work

How we work

  1. 1

    Survey and requirements

    We visit the facility, map the heat loads and air requirements for each department, and agree the duct routes before any design work begins.

  2. 2

    Design and supply

    We design the duct network and fabricate it in our own workshop to SMACNA specifications, and supply units from our authorised brands: Carrier, YORK, General, Midea, Gree and Smart Gold.

  3. 3

    Phased coordinated installation

    In operating buildings we work with management to phase the installation so adjacent departments stay open, and control dust and noise away from patient areas.

  4. 4

    Commissioning and follow-up

    We commission the systems, measure airflow in each department, and adjust the dampers until the design requirements are met, then hand over the facility with a maintenance plan.

Survey-based design or an off-the-shelf solution?

AlrabihThe usual way
Design basisEach department surveyed separatelyOne solution for the whole building
Ventilation and extractTailored to each space's functionUnbalanced between departments
MaintenanceWithout closing departmentsFull work stoppage
DuctworkFabricated in-house to SMACNA specOff-the-shelf non-compliant ducts
Copper runsMueller, no welded jointsMany welded joints

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Sawari's hospitals are relatively modern and spread over open land with multi-storey departments, holding operating theatres, intensive care units and diagnostic wards that all need stable temperature and humidity. Multi-zone central systems are common here and must run efficiently while allowing safe maintenance without stopping any medical department.

Al Sawari lies in north Jeddah, a district of modern hospitals and large clinics on relatively open land.

Most hospital cooling systems in Al Sawari are multi-zone central because of the buildings' large footprint and separate medical departments.

The AC setup in Al Sawari

  1. 1

    Multi-zone central system

    Modern Al Sawari hospitals need a central system divided into separate zones for each medical department with independent control.

  2. 2

    Temperature and humidity control units

    Operating theatres and intensive care units need units that precisely control temperature and relative humidity continuously.

  3. 3

    Air filtration and purification systems

    Hospital sterility standards require high-efficiency filters and purification of both incoming and exhaust air.

Before the visit

Before our visit in Al Sawari

  1. 1

    Arrange a comprehensive building and department survey

    Before design, we need a detailed survey of each department's dimensions, floor count and available electrical panels.

  2. 2

    Identify outdoor unit access points

    Confirm that safe roof areas or external walls are available for mounting the large outdoor units.

  3. 3

    Coordinate with hospital management on maintenance times

    Agree with management on a maintenance and inspection schedule that does not clash with critical medical operating hours.

FAQ

Questions about Hospital HVAC

How do ventilation needs differ across hospital departments?

Ventilation needs vary from one department to the next based on the activity in each area and the requirements set by the facility's designer and the site survey. Operating theatres need highly filtered, directionally controlled air, while patient rooms, corridors and administrative areas each carry different requirements. We build the duct network and select units from the facility's drawings and its specific requirements, not from general assumptions.

Can systems be maintained without stopping sensitive departments?

Yes, but it requires careful planning before the maintenance date. We agree with facility management on a schedule that names the section and the right time window, then isolate the target section using dampers and blanking plates without affecting adjacent departments. Corrective tasks such as replacing a capacitor or repairing a flare joint are carried out within the agreed time window.

What governs duct network design in a medical building?

Design is governed by the approved facility drawings and each department's requirements as defined by the site survey and the specialist designer. We fabricate ducts in our own workshop from G90 galvanised sheet to project dimensions, and use Kimmco and Armaflex insulation with Foster sealants to control leakage. Distribution and pressure in each section follow the specifications drawn for that department individually.

What governs duct network design in a medical building?

Design is governed by the approved facility drawings and each department's requirements as defined by the site survey and the specialist designer. We fabricate ducts in our own workshop from G90 galvanised sheet to project dimensions, and use Kimmco and Armaflex insulation with Foster sealants to control leakage. Distribution and pressure in each section follow the specifications drawn for that department individually.

Do you work with small clinics or only hospitals?

We work with medical facilities of all sizes, from a clinic in a residential district to a multi-storey medical complex. The size of the facility does not change the principle: the site survey is the starting point, and from it we determine unit types, duct dimensions and fresh-air requirements for each zone. Preventive and corrective maintenance contracts are available for clinics and hospitals alike.

How do you design a cooling system for a multi-department hospital?

We ask about each department's temperature, humidity and air-change needs, carry out a site survey to plan ducting and zones, then select units and capacities that suit each department separately.

Can you maintain the system without stopping hospital departments?

Yes, we coordinate maintenance with hospital management to cover system zones gradually so that medical departments stay cooled throughout operating hours.

Operating theatres need special sterility standards, how does your system handle this?

We use high-efficiency filters and a design that ensures positive airflow in operating theatres, with complete isolation from other departments' systems.

How do you ensure cooling continues if a main unit fails?

We recommend a design with backup units or independent zones that can operate separately, with regular checks of all critical system components.

The Jeddah corniche in cool weather

Start with a survey of your medical facility

WhatsApp or call us to arrange a site survey. We serve all Jeddah districts Saturday to Thursday, eight in the morning to eight in the evening.

CallWhatsApp