HVAC for learning spaces

School HVAC in Al Fanar

In Al Fanar, far north Jeddah, modern schools with high ceilings and extensive glazing need a powerful AC system to handle high heat gain from natural light and direct sun. Alrabih designs one that cools quickly and leaves no dead zones in large classrooms.

  • Even distribution
  • Quiet in class
  • Summer maintenance

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When a school needs a specialist

  1. 1

    Hot classrooms affecting learning

    When teachers report heat that breaks concentration and tires students by midday, the problem is usually in air distribution, not unit capacity. A site survey finds where it goes wrong and what is needed.

  2. 2

    Unit noise interrupting the lesson

    A unit in the wrong spot, a clogged filter or an unbalanced fan creates noise that distracts the class. We find the source on site and fix it, and at installation we choose units and routes suited to a classroom environment.

  3. 3

    Upgrading the system over summer

    The long summer break is the only window for installation or replacement work that needs extended hours inside classrooms. We plan with school management to finish before the first school day so the timetable is not affected.

Who it's for

  • Running a school that needs maintenance

    We set up a preventive and corrective maintenance contract covering classrooms, the prayer room and corridors, carrying out major work in the summer break so the school year starts with a sound system.

    Ask on WhatsApp
  • Building a new school that needs AC design

    We review drawings with the contractor and design air distribution and ductwork before ceilings close, so every classroom has even airflow and low noise from the first day of use.

    Ask on WhatsApp

What our school work covers

  • Survey of all rooms
  • Air distribution and unit placement
  • Units beyond students' reach
  • Ductwork to SMACNA standards
  • Preventive and corrective maintenance contracts
Request a quote

How we work

How we work

  1. 1

    School building survey

    We visit the school, measure classrooms, corridors and the prayer room, and record heat sources and loads in each space before making any recommendation.

  2. 2

    System design and planning

    We draw a layout showing unit positions, duct routes and ventilation openings, and agree an installation schedule with school management so work does not clash with classes.

  3. 3

    Installation during the break

    We carry out installation during the holiday or at times that do not disrupt school, mounting units in high or protected positions away from students.

  4. 4

    Commissioning and handover

    We run the full system and check air distribution in every classroom, measuring the air at desk level, then hand over to the school with a record of what was done.

Planned installation or scattered units?

AlrabihThe usual way
Air distributionDesigned for the classroomUneven, corners stay hot
Noise levelSiting and route reduce noiseUnit drowning out the teacher
Unit positionOut of students' reachAt hand height
Summer servicePlanned before term startsFaults appear in the first week
Fresh air supplyDesigned into the layoutAn open window or nothing

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Fanar's modern schools feature contemporary architecture with high ceilings and large glass walls to capture natural light and views. This means significant heat gain during morning and evening sun hours, especially in sports and science rooms which may have extra lighting. The system must respond quickly to temperature swings and sudden heat load changes, distributing air evenly even in large classrooms that can exceed 300 square metres.

Al Fanar is a modern district in far north Jeddah, characterised by contemporary architecture with extensive glazing and high ceilings.

Large Al Fanar classrooms typically need 20 to 30 tonne units per single classroom, with multiple outlets to avoid strong cold draughts.

The AC setup in Al Fanar

  1. 1

    High-capacity central system for intense heat gain

    Al Fanar schools need a central unit rated 100 to 150 tonnes to handle the extensive glazing, direct sun and indoor lighting.

  2. 2

    Multiple outlets with separate control in large classrooms

    Each large classroom gets air from multiple outlets, each with a separate damper so temperature can be balanced anywhere in the room without affecting other zones.

  3. 3

    Large-capacity outdoor unit in a well-ventilated area

    A large outdoor unit needs ample space and good airflow around the condenser, so we site it on a separate roof or broad external area away from building walls.

Before the visit

Before our visit in Al Fanar

  1. 1

    Measure glass area and lighting power in each classroom

    Calculate glass area, shading type if any, number and type of light fixtures, as these determine the actual heat gain per classroom.

  2. 2

    Set temperature monitoring points in classrooms

    Ask the administration to place temperature sensors at different points in large classrooms before the new term starts, so we can calibrate outlets and dampers based on actual readings.

  3. 3

    Confirm outdoor unit location and surrounding clearance

    Ensure the large outdoor unit will be sited with adequate space for maintenance and airflow from all sides, away from walls or obstacles that might restrict air intake.

FAQ

Questions about School HVAC

How do you keep noise low inside the classroom?

Noise usually comes from high air velocity or an indoor unit mounted on a shared wall between two classrooms. We select units with low sound ratings, calculate air velocity at each outlet to prevent whistling, and insulate duct runs above the suspended ceiling. The exact unit position and diffuser angle are decided during a site survey of each room.

How do you handle the prayer room and corridors alongside classrooms?

The prayer room needs wide, quiet air distribution at low level above worshippers, which is quite different from a classroom. Corridors need enough cooling to prevent hot air from flowing into classrooms when doors open. We design each zone on its own air circuit with a separate thermostat; the final layout depends on floor area and ceiling height on site.

Can ductwork be added to an existing school building?

In most cases, yes. We check the gap between the ceiling and the slab, and how accessible the ceiling void is, before making any decision. We fabricate round or rectangular ducts in our own workshop to match the building's exact dimensions, and we route them to avoid structural columns and penetrations. Where ceiling space is too tight, cassette or concealed units may be the better fit.

Why are indoor units positioned out of students' reach?

A low-mounted unit in a room full of students is easily damaged: fins get bent, the drain port gets blocked, and the fan grille gets broken. We mount units at heights and positions that keep them clear of students, while still delivering cooled air down to the seated zone. The precise position is set after the team measures ceiling height and seating layout in each room.

Can the work be done during the school year?

Large tasks such as running new ductwork or replacing multiple units are scheduled during the long summer break to avoid any disruption to lessons. Routine maintenance and isolated repairs can be arranged outside school hours or at weekends in coordination with school management. Work inside classrooms during the school day requires a site assessment first to confirm it can be done without causing disruption.

The extensive glazing brings in strong sun, how do we manage excess heat?

We select a unit larger than standard to handle the extra heat gain, and recommend reflective blinds on sun-facing windows. We also design a dynamic control system that responds to rapid temperature swings.

Very large classrooms may have cold spots and warm spots for students, how do you balance this?

We use multiple outlets distributed across the large room, each controlled separately via thermostatic dampers. We conduct air and temperature balance tests before school starts to confirm comfort throughout.

Modern LED lighting generates less heat, should we reduce the AC capacity?

Modern bulbs do generate less heat, but the extensive glazing and direct sun remain the primary heat source. We factor both in and design based on actual solar measurements, not assumptions.

Very high ceilings make it hard to push cool air down, how do you solve this?

We use downward-angled outlets with calculated air velocity to push cool air through the upper layer and down to occupied zones. We may also install ceiling fans to distribute the cool air evenly across the full height of the classroom.

The Jeddah corniche in cool weather

Plan your school HVAC before the season

Contact Alrabih to book a school survey, Saturday to Thursday, and we will set a plan that finishes before the first day of term.

CallWhatsApp