HVAC for learning spaces
School HVAC in Old Airport
At Old Airport in central Jeddah, schools need robust HVAC withstanding high heat stress and desert conditions. We install powerful units with regular maintenance ensuring reliable cooling year-round.
- Even distribution
- Quiet in class
- Summer maintenance
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When a school needs a specialist
- 1
Hot classrooms affecting learning
When teachers report heat that breaks concentration and tires students by midday, the problem is usually in air distribution, not unit capacity. A site survey finds where it goes wrong and what is needed.
- 2
Unit noise interrupting the lesson
A unit in the wrong spot, a clogged filter or an unbalanced fan creates noise that distracts the class. We find the source on site and fix it, and at installation we choose units and routes suited to a classroom environment.
- 3
Upgrading the system over summer
The long summer break is the only window for installation or replacement work that needs extended hours inside classrooms. We plan with school management to finish before the first school day so the timetable is not affected.
Who it's for
Running a school that needs maintenance
We set up a preventive and corrective maintenance contract covering classrooms, the prayer room and corridors, carrying out major work in the summer break so the school year starts with a sound system.
Ask on WhatsAppBuilding a new school that needs AC design
We review drawings with the contractor and design air distribution and ductwork before ceilings close, so every classroom has even airflow and low noise from the first day of use.
Ask on WhatsApp
What our school work covers
- Survey of all rooms
- Air distribution and unit placement
- Units beyond students' reach
- Ductwork to SMACNA standards
- Preventive and corrective maintenance contracts
How we work
How we work
- 1
School building survey
We visit the school, measure classrooms, corridors and the prayer room, and record heat sources and loads in each space before making any recommendation.
- 2
System design and planning
We draw a layout showing unit positions, duct routes and ventilation openings, and agree an installation schedule with school management so work does not clash with classes.
- 3
Installation during the break
We carry out installation during the holiday or at times that do not disrupt school, mounting units in high or protected positions away from students.
- 4
Commissioning and handover
We run the full system and check air distribution in every classroom, measuring the air at desk level, then hand over to the school with a record of what was done.
Planned installation or scattered units?
| Alrabih | The usual way | |
|---|---|---|
| Air distribution | Designed for the classroom | Uneven, corners stay hot |
| Noise level | Siting and route reduce noise | Unit drowning out the teacher |
| Unit position | Out of students' reach | At hand height |
| Summer service | Planned before term starts | Faults appear in the first week |
| Fresh air supply | Designed into the layout | An open window or nothing |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Old Airport in central Jeddah has an open desert character with minimal natural shade and direct exposure to harsh sun. Schools here face severe heat stress especially on south and west walls, and desert dust accumulates rapidly on outdoor cooling units. The intense heat demands very high capacity units and frequent maintenance cleaning condensers and filters. Design must focus on reducing heat leakage and dust protection.
Old Airport is a central Jeddah area with open desert character, exposed to harsh sun, high dust and minimal natural shade.
Schools at Old Airport typically require very high-capacity cooling units to handle severe heat load, with robust filters to withstand desert dust accumulation.
The AC setup in Old Airport
- 1
Very high-capacity central cooling unit
Schools here need exceptional capacity central units to handle severe heat load and desert dust conditions.
- 2
Extra split units for south and west walls
Classrooms and spaces on south and west sides need supplementary cooling units to balance heavy heat load from direct sun.
- 3
Strong filters and dust protection
Extra filters and positioning the outdoor unit away from sandy passages reduce dust buildup and extend unit lifespan.
Before the visit
Before our visit in Old Airport
- 1
Inspect site, sun exposure and dust sources
Visit the school site, identify the most heat and dust-exposed walls, and note sandy wind patterns around the building.
- 2
Assess electrical wiring and circuits
Inspect current electrical wiring and circuit capacity, as powerful units may require additional circuits or an upgraded electrical panel.
- 3
Plan regular maintenance every month or two
Agree on scheduled cleaning of condenser and filters, especially in summer months, to ensure reliable performance amid desert dust.
More districts for School HVAC
Other services in Old Airport
FAQ
Questions about School HVAC
How do you keep noise low inside the classroom?
Noise usually comes from high air velocity or an indoor unit mounted on a shared wall between two classrooms. We select units with low sound ratings, calculate air velocity at each outlet to prevent whistling, and insulate duct runs above the suspended ceiling. The exact unit position and diffuser angle are decided during a site survey of each room.
How do you handle the prayer room and corridors alongside classrooms?
The prayer room needs wide, quiet air distribution at low level above worshippers, which is quite different from a classroom. Corridors need enough cooling to prevent hot air from flowing into classrooms when doors open. We design each zone on its own air circuit with a separate thermostat; the final layout depends on floor area and ceiling height on site.
Can ductwork be added to an existing school building?
In most cases, yes. We check the gap between the ceiling and the slab, and how accessible the ceiling void is, before making any decision. We fabricate round or rectangular ducts in our own workshop to match the building's exact dimensions, and we route them to avoid structural columns and penetrations. Where ceiling space is too tight, cassette or concealed units may be the better fit.
Why are indoor units positioned out of students' reach?
A low-mounted unit in a room full of students is easily damaged: fins get bent, the drain port gets blocked, and the fan grille gets broken. We mount units at heights and positions that keep them clear of students, while still delivering cooled air down to the seated zone. The precise position is set after the team measures ceiling height and seating layout in each room.
Can the work be done during the school year?
Large tasks such as running new ductwork or replacing multiple units are scheduled during the long summer break to avoid any disruption to lessons. Routine maintenance and isolated repairs can be arranged outside school hours or at weekends in coordination with school management. Work inside classrooms during the school day requires a site assessment first to confirm it can be done without causing disruption.
Heat at Old Airport is severe, can the system cope?
We select units with capacity significantly exceeding peak heat load, supply extra filters and schedule regular condenser cleaning. Monthly summer maintenance is essential.
Desert dust accumulates fast on outdoor units, does this affect performance?
Yes, dust buildup reduces condenser efficiency and cooling. We install robust filters and position units away from sandy passages. Regular cleaning every month or two is vital for performance.
South and west walls face direct sun all day, do we need extra units?
Yes, we often recommend supplementary split units for south and west-facing classrooms. Sunshades or reflective wall coating can also reduce heat load.
Can the electrical wiring handle high consumption of powerful units?
We assess current wiring capacity and may need to upgrade circuits or add a new electrical panel for high-power units. We evaluate wiring before installation.