Fitted right first time
Split AC installation in Al Khaleej
In Al Khaleej district north of Jeddah, split AC installation serves modern residential buildings with spacious units and well-organised outdoor areas. Alrabih's team installs both units precisely, runs insulated copper and drainage sloping correctly, so cooling starts immediately on day one.
- Mueller copper
- Full vacuum
- Proper drain
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
When you need a proper installer
- 1
A new unit for a room or flat
You have bought the unit, or are about to, and want it fitted once, not to find a refrigerant leak or water on the floor a few weeks later. Getting it right first time saves you all of that.
- 2
Not sure where the outdoor unit goes
In Jeddah flats the choice is usually the roof, the balcony or the facade. We pick a spot where the condenser gets enough air, a technician can reach it for servicing, and neither noise nor drain water bothers the neighbours.
- 3
A past install that went wrong
Weak cooling since day one, water running down the wall, a loud indoor unit. These are usually installation mistakes, not faults in the unit, and our installation is built step by step to avoid them.
Who it's for
Moving into a new flat that needs AC
We plan every unit position and copper route in one go, so the whole flat ends up neat and consistent.
Ask on WhatsAppFitting AC in a shop or office
We place the units so cool air reaches the entrance and the work area, and arrange outdoor units and drains to suit the shopfront and the building's rules.
Ask on WhatsApp
What the installation covers
- Site check and unit positions
- Insulated copper, sealed wall core
- Drain line with correct fall
- Vacuum and leak test
- Start-up test with you present
How we work
How we work
- 1
Send a photo
WhatsApp us a photo of the room, where the outdoor unit might go and your district, and we tell you what the job needs before the visit.
- 2
Agree positions and route
On site, the technician agrees the unit positions and the copper and drain route with you before drilling any wall.
- 3
Fit and vacuum
We mount both units, run and insulate the copper, then vacuum the line with a pump and check the joints before releasing the refrigerant held in the outdoor unit.
- 4
Start-up and handover
We run the unit, measure the air coming out, check the drain flows, then leave the room clean and show you the remote and how to clean the filter.
A careful install or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Vacuum | Pumped before start-up | Often skipped |
| Copper | Mueller, fully insulated | Patchy insulation |
| Drain | Falls, so no drips | Water down the wall |
| Outdoor unit spot | Airy and easy to reach | Wherever it fits |
| Wall opening | Sealed tight | Dust gets through |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Khaleej has mid to high-rise residential buildings with modern design and separate outdoor areas per unit, offering good flexibility for outdoor unit placement. The clean, organised building stock eases installation, but intense summer heat and the quality of ventilation around outdoor units demand skilled fitting and strong insulation to ensure efficient cooling and quiet operation.
Al Khaleej in north Jeddah comprises modern residential buildings with orderly design and separate outdoor areas per unit.
Most outdoor units are mounted on private roofs or separate courtyards due to adequate outdoor space available.
The AC setup in Al Khaleej
- 1
Split with outdoor unit on private roof or courtyard
The outdoor unit is mounted on a private roof or courtyard, providing ample space and good protection from heat and wind.
- 2
Condensate drainage to separate water collection
The outdoor line drains to the building's water collection system or is directed safely away from foundations and neighbours.
- 3
Strong insulation against intense heat and dust
Copper and wires are insulated with material that withstands high temperatures and seasonal dust in north Jeddah.
Before the visit
Before our visit in Al Khaleej
- 1
Confirm building management approval for roof or courtyard work
Get building management's written approval for the chosen location and drainage route before the visit.
- 2
Identify building electrical and water routes
Ask building management or the previous resident about electrical and water routes in walls and ceilings to avoid risky drilling.
- 3
Identify access point and available working space
Confirm the team has easy access to the roof or courtyard and adequate space to work and mount the unit safely.
More districts for Split AC installation
Other services in Al Khaleej
FAQ
Questions about Split AC installation
Will you install a unit I bought elsewhere?
Yes, we install units you have bought yourself. Before the visit we ask the model, its capacity and where both units will go, so we know the copper length. If you have not bought one yet, we are an authorised distributor for Carrier, YORK, General, Midea, Gree and Smart Gold and can help you choose.
Why does the line need vacuuming before start-up?
New pipes hold air and moisture, and Jeddah's humid air adds more. Mixed with refrigerant, they weaken cooling and strain the compressor over time. We pull them out with a vacuum pump, watch that the reading holds so we know the line is tight, and only then release the refrigerant.
Can the outdoor unit be far from the room?
Yes, within the manufacturer's limits for line length and height difference. We use Mueller copper in runs of up to 30 metres without welded joints, so there are fewer joints that could leak, and the survey shows whether a long run needs extra refrigerant.
Can you hide the copper and cables in the wall?
It depends on the house. In a new build or during finishing works, the copper can run inside the wall before plastering. In a lived-in home we use neat plastic trunking in the wall colour. We show you the better option for your home at the survey, before any work starts.
What if the outside wall cannot carry the unit?
We check the wall before fixing anything, because some facades are clad in stone or panels that cannot take the weight. Then we set the unit on a floor stand on the roof or balcony, or on a bracket anchored to the concrete itself, not the cladding, so it does not shake loose.
The buildings here are modern, is installation different from older areas?
Yes, modern buildings have stronger materials and better ventilation design, but we apply the same quality standards for mounting, insulation and drainage.
Roofs and courtyards are shared, how do we avoid conflicts over space?
We coordinate with building management in advance to identify the best location for the outdoor unit, and confirm everyone's agreement before installation.
Summer heat is intense here, does this affect installation and performance?
Yes, high heat increases cooling pressure, so we choose a shaded location for the outdoor unit if possible, use robust insulation and vacuum the lines before start-up.
Building electrical circuits follow set paths, how do we mount the outdoor unit safely?
We locate the building's electrical and plumbing routes before drilling and mounting, ensuring any holes avoid existing connections.












































































