Window unit fitted right

Window AC installation in Prince Fawaz South

In Prince Fawaz South, a densely built residential district with windows of varied sizes and shapes, window unit installation demands precise measurement and tight sealing against the area's humidity and heat. Alrabih's team measures each window carefully and fits the unit with the correct tilt for accurate drain flow.

  • Firm frame
  • Sealed gaps
  • Outward drain

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When a window unit is the right choice

  1. 1

    A room with no outdoor unit space

    Some rooms have no wall facing a suitable space for an outdoor unit. A window AC is the practical answer: one unit in the opening cools the room and expels heat directly outside.

  2. 2

    An annex, staff housing or storeroom

    Annexes, staff rooms and warehouses need real cooling without the cost of long copper and cable runs. A window unit suits these spaces well when the right opening exists or can be made.

  3. 3

    An existing window of the right size

    When a wall already has a window opening that matches the unit you have chosen, the frame fits straight in without cutting new concrete. We confirm at the survey that the opening suits the unit and the wall carries the load.

Who it's for

  • Need to cool a maid's room or home annex

    We survey the opening or proposed wall in the annex, fit the unit in a secure frame and seal every gap so no hot humid air enters the space.

    Ask on WhatsApp
  • Managing a staff housing building that needs practical cooling

    We survey each room and its existing openings, then install units in level frames with the correct outward tilt in every room as the survey findings direct.

    Ask on WhatsApp

What the installation covers

  • Opening and wall check
  • Frame levelled and secured
  • Gaps sealed with insulation
  • Drainage tilt adjusted
  • Unit started and tested
Request a quote

How we work

How we work

  1. 1

    Send a photo

    WhatsApp us a photo of the opening or the proposed wall and your district, so the technician arrives with the right frame and fixings.

  2. 2

    Site survey

    On site the technician measures the opening, checks the wall, confirms there is a suitable power point near the unit, and agrees with you on any changes needed before starting.

  3. 3

    Fit and seal

    We fit the frame level, set the unit with the correct outward tilt, then seal every gap around the frame so no hot air, dust or humidity enters.

  4. 4

    Start-up and handover

    We run the unit, check the cooling and confirm condensate flows outward, then leave the space clean and show you how to clean the filter.

Proper installation or just placing the unit?

AlrabihThe usual way
FrameLevel and firmly securedPropped without fixing
GapsSealed with insulating materialsOpen or thin plastic
TiltOutward fall drains waterLevel or tilted inward
PowerDedicated nearby socketExtension from another room
Site cleanlinessSpace left cleanDust and debris left behind

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Prince Fawaz South is packed with multi-storey residential blocks, and window frames vary from building to building due to different construction periods. High humidity and constant heat make fitting sensitive work, especially if the frame is old or weak. Coordination with neighbouring flat occupants is vital because population density is high and spaces are shared between units.

Prince Fawaz South in South Jeddah is a dense district of multi-storey residential blocks with window frames varying in size and age.

Window units here are often fitted in multiple flats within the same building, requiring each window to be individually calibrated according to its frame condition.

The AC setup in Prince Fawaz South

  1. 1

    Flat window with standard frame walls

    Most flats in Prince Fawaz have standard window frames allowing uniform-size window units to be fitted without extensive modifications.

  2. 2

    Weak window requiring reinforcement

    Some older flats have weakened window frames from humidity and use, so we add metal supports to safely bear the unit's weight.

  3. 3

    Corner or edge window

    Windows at the building corner or near edges face stronger winds, so we ensure tight sealing and a strong frame to withstand extra pressure.

Before the visit

Before our visit in Prince Fawaz South

  1. 1

    Inform your neighbours of the visit time in advance

    The flats are very close, so tell the neighbouring residents about the installation time to avoid unexpected disturbance.

  2. 2

    Leave working space around the window

    Make sure there is no furniture, curtains or other obstacles near the window inside or out before the visit time.

  3. 3

    Prepare the electrics and power for the unit

    Confirm there is a power socket near the window on a circuit with sufficient capacity, and tell us where it is.

FAQ

Questions about Window AC installation

Can you cut a new opening in the wall if there is none?

Yes, if no suitable opening exists we can cut one. At the survey we check the wall type and thickness and look for columns or cables that might be in the way, then agree the best position with you before any cutting begins.

Why does the outward tilt matter on a window unit?

A window unit produces condensate on its indoor side throughout operation. If the unit sits level or tilts inward, water pools in the base and runs down the inside wall. A slight outward tilt sends that water to the back of the unit and out, away from the wall and furniture.

How do you seal the gaps around the frame given Jeddah's climate?

Jeddah combines high heat, humidity and salty sea air, so sealing materials must hold up in those conditions. We use insulating and sealing materials suited to the opening and wall type, and the survey determines the right choice based on the gap size and wall construction.

Does a window unit need its own power point?

A window unit draws a high current at start-up, and sharing a socket with other appliances strains the wiring and trips the breaker. The technician checks at the survey that a suitable socket is close to the unit position, and if one is not there we explain what is needed before installation proceeds.

Does the weight of a window unit affect how it is fixed?

Yes, the unit's weight directly affects how the frame is fixed and what support is needed. A concrete wall requires different treatment from a brick wall, and a wide opening needs more support than a narrow one. The technician decides at the survey what fixing method and materials suit the unit and the wall.

My window frame is old and weak, can you still fit the unit safely?

We inspect the frame first; if it is weak we fit additional metal supports or advise you to reinforce it before installation to ensure safety.

The flats here are very close together, how do you avoid disturbing neighbouring residents?

We coordinate with your neighbours in advance and complete the installation as quickly as possible, using tools that do not cause loud noise.

Humidity is very high in Prince Fawaz South, does this speed up window unit corrosion?

Yes, high humidity accelerates corrosion and rust, so we use robust sealing around the frame and ensure condensate drains efficiently to prevent it pooling round the frame.

Do you test the unit immediately after fitting to confirm it works?

Yes, we run the unit immediately after fitting and confirm the drain works and cooling is correct before we leave the site.

The Jeddah corniche in cool weather

Get your window unit fitted properly

WhatsApp a photo of the opening or proposed wall, or call us, and we will arrange a survey visit in your district, Saturday to Thursday.

CallWhatsApp